Search OEDI Data
Showing results 101 - 125 of 214.
Show
results per page.
Order by:
Available Now:
Research Areas
Accessibility
Data Type
Organization
Source
NREL MOIS Data for NWEI Azura January 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 27, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura February 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 31, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura June 2015
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 18, 2016
15 Resources
0 Stars
Publicly accessible
15 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura March 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
May 31, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura June 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, H...
Nelson, E. National Renewable Energy Laboratory
Jun 30, 2016
16 Resources
0 Stars
Publicly accessible
16 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura July 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, H...
Nelson, E. National Renewable Energy Laboratory
Sep 25, 2016
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/50th Testing Super Watt Wave Catcher Barge Attenuator
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Super Watt Wave Catcher Barge team, and includes:
1/50th test data (raw & processed)
1/50th test data video and pictures
1/50th Test plans and testing documents
SSTF_S...
Scharmen, W. Ricardo Detroit Technical Center
Dec 04, 2015
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
LandRAY PTO Testing Utilizing the NREL NWTC 5MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Lenee-Bluhm, P. and Rhinefrank, K. Columbia Power Technologies, Inc.
Jun 13, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Advanced WEC Dynamics and Controls, Test 1
Numerous studies have shown that advanced control of a wave energy converter's (WEC's) power take off (PTO) can provide significant increases (on the order of 200-300%) in WEC energy absorption. Transitioning these control approaches from simplified paper studies to application in...
Coe, R. Sandia National Laboratories
Feb 26, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
WEC Controls Optimization Final Report
The over-arching project objective is to fully develop and validate optimal controls frameworks that can subsequently be applied widely to different WEC devices and concepts. Optimal controls of WEC devices represent a fundamental building block for WEC designers that must be cons...
Previsic, M. and Karthikeyan, A. Re Vision Consulting
Aug 26, 2020
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Aquantis 2.5 MW Ocean Current Generation Device Scaled Tank Test Design and Results
Aquantis 2.5 MW Ocean Current Generation Device, Tow Tank Dynamic Rig Structural Analysis Results. This is the detailed documentation for scaled device testing in a tow tank, including models, drawings, presentations, cost of energy analysis, and structural analysis. This datase...
Swales, H. et al Dehlsen Associates, LLC
Jun 03, 2015
46 Resources
0 Stars
Publicly accessible
46 Resources
0 Stars
Publicly accessible
Azura WEC 1/15th Wave Tank Test Data
Test data from the 1/15th Wave Tank Tests of the Azura performed in 2017/2018 to validate the power performance and survivability of the Azura Design developed by Northwest Energy Innovations (NWEI) planned for deployment at the US Navy's Wave Energy Test Site. Raw and processed d...
Ling, B. Northwest Energy Innovations
Feb 02, 2018
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
Advanced Control Systems for Wave Energy Converters
This submission contains several papers, a final report, descriptions of a theoretical framework for two types of control systems, and descriptions of eight real-time flap load control policies with the objective of assessing the potential improvement of annual average capture eff...
Scruggs, J. et al Resolute Marine Energy, Inc.
Jan 30, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
StingRAY WEC Risk Register
Risk Registers for major subsystems of the StingRAY WEC completed in compliance with the DOE Risk Management Framework developed by NREL.
Rhinefrank, K. Columbia Power Technologies, Inc.
Feb 24, 2017
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
StingRAY Updated WEC Risk Registers
Updated Risk Registers for major subsystems of the StingRAY WEC completed according to the methodology described in compliance with the DOE Risk Management Framework developed by NREL.
Rhinefrank, K. and Ondusko, M. Columbia Power Technologies, Inc.
Jun 27, 2018
17 Resources
0 Stars
Publicly accessible
17 Resources
0 Stars
Publicly accessible
HERO WEC Bills of Materials: WEC, RO System, and Submersible Pump
This submission includes detailed Bills of Materials for the NREL-designed and built Hydraulic and Electric Reverse Osmosis Wave Energy Converter (HERO WEC), as well as the reverse osmosis assembly and submersible pump that are used in the HERO WEC.
The WEC file is specific to th...
Jenne, S. and Panzarella, J. National Renewable Energy Laboratory
Jan 01, 2024
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
HERO WEC V1 Upgrades SolidWorks Models (WEC, RO System, and Submersible Pump Housing)
The attached zip files include SolidWorks pack-and-go assemblies of NREL's HERO WEC (hydraulic and electric reverse osmosis wave energy converter), the reverse osmosis (RO) assembly, and the submersible pump assembly that is used to provide flow to the RO assembly in the electric ...
Jenne, S. and Panzarella, J. National Renewable Energy Laboratory
Jan 08, 2024
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Reference Model 2 Cost Breakdown (RM2: River Current Turbine)
Contains the Reference Model 2 (RM2) spreadsheets with the cost breakdown structure (CBS) for the levelized cost of energy (LCOE) calculations for a single RM2 device and multiple unit arrays. These spreadsheets are contained within an XLSX file and a spreadsheet editor such as Mi...
Neary, V. et al Sandia National Laboratories
Sep 30, 2014
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
CODAS Data from Oliktok Point, Beaufort Sea, Alaska
Cryosphere/Ocean Distributed Acoustic Sensing (CODAS) data collected from the Beaufort Sea, Alaska, using ~37.4 km of dark telecommunications fiber located at Oliktok Point, Alaska. Data were collected with a Silixa iDAS, using 10 m gauge length, 2 m spatial resolution, and 1000 H...
Baker, M. and Abbott, R. Sandia National Laboratories
Aug 08, 2023
23 Resources
0 Stars
Publicly accessible
23 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System ProteusDS Version 2.43.5 Files
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/20th Testing AquaHarmonics Point Absorber
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the AquaHarmonics team, including the 1/20th scale test plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obtain the necess...
Scharmen, W. Ricardo Detroit Technical Center
Sep 02, 2016
69 Resources
0 Stars
Publicly accessible
69 Resources
0 Stars
Publicly accessible
HERO WEC V1.0 WEC-Sim Detailed Simulation Runs and Summary Data
Data sets from simulation runs include 144 wave cases that were run based on the WEC-Sim model (https://mhkdr.openei.org/submissions/483). The 144 wave cases represent waves with the following wave height and wave period ranges:
Significant Wave Height: 0.25 4.0m in 0.25m incre...
Jenne, S. National Renewable Energy Laboratory
Aug 12, 2022
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
LandRAY PTO Test Plans with NREL NWTC 5 MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Prudell, J. et al Columbia Power Technologies, Inc.
Feb 29, 2016
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Reference Model 2 Scaled Geometry (RM2: River Current Turbine)
Contains the Reference Model 2 (RM2) scaled scale geometry files of the River Current Turbine, developed by the Reference Model Project (RMP). These scaled geometry files are saved as SolidWorks assembly, IGS, and STEP files, and require a CAD program to view. The scaled RM2 devic...
Neary, V. and Hill, C. Sandia National Laboratories
Sep 30, 2014
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Reference Model 2 Full Scale Geometry (RM2: River Current Turbine)
Contains the Reference Model 2 (RM2) full scale geometry files of the River Current Turbine, developed by the Reference Model Project (RMP). These full scale geometry files are saved as SolidWorks assembly, IGS, X_T, and STEP files, and require a CAD program to view. This data was...
Neary, V. et al Sandia National Laboratories
Sep 30, 2014
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible