Heavy-Duty Electric Fleet Depot Charging Load Profiles & Substation Load Integration Assessment Results
This data set includes the 24-hour fleet depot charging load profiles (15-min. average demand) and substation load integration assessment results produced for the study, "Heavy-Duty Truck Electrification and the Impacts of Depot Charging on Electricity Distribution Systems", publi...
Borlaug, . et al Center for Integrated Mobility Sciences
Apr 20, 2021
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Heavy-Duty Vehicle Activity for EPA MOVES
The U.S. Environmental Protection Agency’s (EPA’s) MOtor Vehicle Emission Simulator (MOVES) is a publicly available tool used by researchers and policymakers to help understand motor vehicle emission sources at a national, county, and project level. Estimates of heavy-duty act...
Zhang, . et al Center for Integrated Mobility Sciences
Jun 04, 2021
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)
Berkeley Labs "Utility-Scale Solar", 2022 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developm...
Seel, J. et al Lawrence Berkeley National Lab
Sep 20, 2022
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Utility-Scale Solar, 2023 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)
Berkeley Labs "Utility-Scale Solar", 2023 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developm...
Seel, J. et al Lawrence Berkeley National Lab
Sep 05, 2023
5 Resources
1 Stars
Publicly accessible
5 Resources
1 Stars
Publicly accessible
Utility-Scale Solar, 2024 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)
Berkeley Labs "Utility-Scale Solar", 2024 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developm...
Seel, J. et al Lawrence Berkeley National Lab
Sep 27, 2024
5 Resources
1 Stars
Publicly accessible
5 Resources
1 Stars
Publicly accessible