"Womp Womp! Your browser does not support canvas :'("

Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)

Publicly accessible License 

Berkeley Labs "Utility-Scale Solar", 2022 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2021, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.

Citation Formats

TY - DATA AB - Berkeley Labs "Utility-Scale Solar", 2022 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2021, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data. AU - Seel, Joachim A2 - Bolinger, Mark A3 - Warner, Cody A4 - Robson, Dana DB - Open Energy Data Initiative (OEDI) DP - Open EI | National Renewable Energy Laboratory DO - 10.25984/2228280 KW - energy KW - power KW - solar KW - Berkeley Lab KW - capital costs KW - capacity factors KW - LCOE KW - power purchase agreeents KW - wholesale market value KW - utility-scale solar KW - PV KW - CPSP KW - Battery KW - PV battery KW - operating costs KW - costs KW - interconnection queue KW - 2022 KW - Energy Analysis KW - Solar Power KW - plant-level KW - data KW - ground-mounted KW - photovoltaic KW - CSP KW - deployment KW - technology KW - capital KW - operating cost KW - capacity factor KW - PPA KW - price KW - power purchase agreement KW - market value KW - capacity KW - market KW - analysis KW - hourly KW - generation LA - English DA - 2022/09/20 PY - 2022 PB - Lawrence Berkeley National Lab T1 - Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC) UR - https://doi.org/10.25984/2228280 ER -
Export Citation to RIS
Seel, Joachim, et al. Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC). Lawrence Berkeley National Lab, 20 September, 2022, Open Energy Data Initiative (OEDI). https://doi.org/10.25984/2228280.
Seel, J., Bolinger, M., Warner, C., & Robson, D. (2022). Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC). [Data set]. Open Energy Data Initiative (OEDI). Lawrence Berkeley National Lab. https://doi.org/10.25984/2228280
Seel, Joachim, Mark Bolinger, Cody Warner, and Dana Robson. Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC). Lawrence Berkeley National Lab, September, 20, 2022. Distributed by Open Energy Data Initiative (OEDI). https://doi.org/10.25984/2228280
@misc{OEDI_Dataset_5796, title = {Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)}, author = {Seel, Joachim and Bolinger, Mark and Warner, Cody and Robson, Dana}, abstractNote = {Berkeley Labs "Utility-Scale Solar", 2022 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2021, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.}, url = {https://data.openei.org/submissions/5796}, year = {2022}, howpublished = {Open Energy Data Initiative (OEDI), Lawrence Berkeley National Lab, https://doi.org/10.25984/2228280}, note = {Accessed: 2025-05-30}, doi = {10.25984/2228280} }
https://dx.doi.org/10.25984/2228280

Details

Data from Sep 20, 2022

Last updated Jun 18, 2024

Submitted Oct 11, 2022

Organization

Lawrence Berkeley National Lab

Contact

Joachim Seel

510.486.5087

Authors

Joachim Seel

Lawrence Berkeley National Lab

Mark Bolinger

Lawrence Berkeley National Lab

Cody Warner

Lawrence Berkeley National Lab

Dana Robson

Lawrence Berkeley National Lab

DOE Project Details

Project Name Analysis of Solar Market

Project Number 38444

Share

Submission Downloads