Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)
Berkeley Labs "Utility-Scale Solar", 2022 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2021, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.
Citation Formats
TY - DATA
AB - Berkeley Labs "Utility-Scale Solar", 2022 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2021, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.
AU - Seel, Joachim
A2 - Bolinger, Mark
A3 - Warner, Cody
A4 - Robson, Dana
DB - Open Energy Data Initiative (OEDI)
DP - Open EI | National Renewable Energy Laboratory
DO - 10.25984/2228280
KW - energy
KW - power
KW - solar
KW - Berkeley Lab
KW - capital costs
KW - capacity factors
KW - LCOE
KW - power purchase agreeents
KW - wholesale market value
KW - utility-scale solar
KW - PV
KW - CPSP
KW - Battery
KW - PV battery
KW - operating costs
KW - costs
KW - interconnection queue
KW - 2022
KW - Energy Analysis
KW - Solar Power
KW - plant-level
KW - data
KW - ground-mounted
KW - photovoltaic
KW - CSP
KW - deployment
KW - technology
KW - capital
KW - operating cost
KW - capacity factor
KW - PPA
KW - price
KW - power purchase agreement
KW - market value
KW - capacity
KW - market
KW - analysis
KW - hourly
KW - generation
LA - English
DA - 2022/09/20
PY - 2022
PB - Lawrence Berkeley National Lab
T1 - Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)
UR - https://doi.org/10.25984/2228280
ER -
Seel, Joachim, et al. Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC). Lawrence Berkeley National Lab, 20 September, 2022, Open Energy Data Initiative (OEDI). https://doi.org/10.25984/2228280.
Seel, J., Bolinger, M., Warner, C., & Robson, D. (2022). Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC). [Data set]. Open Energy Data Initiative (OEDI). Lawrence Berkeley National Lab. https://doi.org/10.25984/2228280
Seel, Joachim, Mark Bolinger, Cody Warner, and Dana Robson. Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC). Lawrence Berkeley National Lab, September, 20, 2022. Distributed by Open Energy Data Initiative (OEDI). https://doi.org/10.25984/2228280
@misc{OEDI_Dataset_5796,
title = {Utility-Scale Solar, 2022 Edition: Analysis of Empirical Plant-level Data from U.S. Ground-mounted PV, PV+battery, and CSP Plants (exceeding 5 MWAC)},
author = {Seel, Joachim and Bolinger, Mark and Warner, Cody and Robson, Dana},
abstractNote = {Berkeley Labs "Utility-Scale Solar", 2022 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2021, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.},
url = {https://data.openei.org/submissions/5796},
year = {2022},
howpublished = {Open Energy Data Initiative (OEDI), Lawrence Berkeley National Lab, https://doi.org/10.25984/2228280},
note = {Accessed: 2025-05-30},
doi = {10.25984/2228280}
}
https://dx.doi.org/10.25984/2228280
Details
Data from Sep 20, 2022
Last updated Jun 18, 2024
Submitted Oct 11, 2022
Organization
Lawrence Berkeley National Lab
Contact
Joachim Seel
510.486.5087
Authors
Research Areas
Keywords
energy, power, solar, Berkeley Lab, capital costs, capacity factors, LCOE, power purchase agreeents, wholesale market value, utility-scale solar, PV, CPSP, Battery, PV battery, operating costs, costs, interconnection queue, 2022, Energy Analysis, Solar Power, plant-level, data, ground-mounted, photovoltaic, CSP, deployment, technology, capital, operating cost, capacity factor, PPA, price, power purchase agreement, market value, capacity, market, analysis, hourly, generationDOE Project Details
Project Name Analysis of Solar Market
Project Number 38444