OpenEI: Energy Information
  • Open Energy Data Initiative (OEDI)
  • My User
    • Sign Up
    • Login
OEDI logo
  • Data
    • View All Submissions
    • Data Lakes
    • Submit Data
  • Help
    • Frequently Asked Questions
    • Data Submission Best Practices
    • Data Submission Tutorial Videos
    • Contact OpenEI Help
  • About
  • Search

Search OEDI Data

Showing results 1 - 25 of 122.
Show results per page.
Order by:
Available Now:
Filters
Research Areas
Accessibility
Data Type
Organization
Source
"fabrication plan"×

Triton-C WEC Fabrication Plan (DDP)

This is the Fabrication Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface float arrangement. Oscilla Power Inc,...
Stinson, K. and Mundon, T. Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Publicly accessible

Advanced TidGen Power System System Fabrication Plan

The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible

Triton-C WEC Installation, Operations and Maintenance Plan (DDP)

This is the Installation, Operations and Maintenance (IO&M) Plan for the Triton-C WEC based on the Detailed System Design Package (DDP), including a report and visuals pertaining to the overall detailed design of the reaction ring, surface float hull, power take off and surface fl...
Stinson, K. et al Oscilla Power, Inc.
Nov 02, 2020
1 Resources
0 Stars
Publicly accessible

Advanced TidGen Power System Summary Presentation

The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
May 10, 2018
1 Resources
0 Stars
Publicly accessible

Net Shape Fabricated Low Cost MHK Pass-Through the Hub Turbine Blades with Integrated Health Management Technology

The primary objective of this project is to develop a three-blade MHK rotor with low manufacturing and maintenance costs. The proposed program will design, fabricate and test a novel half-scale low cost, net shape fabricated single piece three-blade MHK rotor with integrated healt...
Wess, D. ARL Penn State
Feb 09, 2016
24 Resources
0 Stars
Publicly accessible

M3 Wave DMP/APEX WEC Device Configuration Drawings

Configurations as tested and modeled in final phase of project for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX."
Morrow, M. and Delos-Reyes, M. M3 Wave
Aug 08, 2017
1 Resources
0 Stars
Publicly accessible

H3 StingRAY Final Design and Technical Report

The goal of this Project was to develop a standards-compliant, fabrication-ready design of Columbia Power Technologies' (C-Power) next-generation wave energy converter (WEC), the StingRAY H3. The H3 is a design iteration of C-Power's StingRAY WEC and is intended for electrical pow...
Prudell, J. and Lenee-Bluhm, P. Columbia Power Technologies, Inc.
Sep 15, 2023
2 Resources
0 Stars
Publicly accessible

Advanced TidGen Power System ORPC Public Technical Report, Device Design

Technical report for public dissemination on the design progress for the Advanced TidGen(R) Power System.
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 27, 2018
1 Resources
0 Stars
Publicly accessible

Geothermal Thermoelectric Generation (G-TEG) with Integrated Temperature Driven Membrane Distillation and Novel Manganese Oxide for Lithium Extraction Final Report

This project aims to develop an innovative Geothermal ThermoElectric Generation (G-TEG) system specially designed to both generate electricity and extract high-value lithium (Li) from low-temperature geothermal brines. The process combined five modular technologies including silic...
Renew, J. et al Southern Research Institute
Mar 01, 2018
1 Resources
0 Stars
Publicly accessible

Risk Management Plan and Risk Register for Design Low-Power Wave Energy Converter for Non-Grid Applications

Risk Registers for major subsystems completed according to the methodology described in the Risk Management Plan [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf], also included here.
Amon, E. Columbia Power Technologies, Inc.
Jul 19, 2019
17 Resources
0 Stars
Publicly accessible

Aquantis 2.5 MW Ocean Current Generation Device Scaled Tank Test Design and Results

Aquantis 2.5 MW Ocean Current Generation Device, Tow Tank Dynamic Rig Structural Analysis Results. This is the detailed documentation for scaled device testing in a tow tank, including models, drawings, presentations, cost of energy analysis, and structural analysis. This datase...
Swales, H. et al Dehlsen Associates, LLC
Jun 03, 2015
46 Resources
0 Stars
Publicly accessible

University of Illinois Campus Deep Direct-Use Feasibility Study Revised Campus Master Plan Map

Revised master plan for the University of Illinois Urbana-Champaign campus. Note, the corridor where the UIUC Energy Farm is located will expand with the relocation of the Swine Research Farm and Feed Tech Center.
Lin, Y. University of Illinois
Apr 26, 2018
1 Resources
0 Stars
Publicly accessible

SeaRAY Autonomous Offshore Power System Final Report

This report documents the full lifecycle of the SeaRAY Autonomous Offshore Power System (AOPS) project, detailing the design, development, testing, deployment, and recovery of a novel low-power wave energy system intended for remote, non-grid applications. The report includes tech...
Hammagren, E. et al Columbia Power Technologies, Inc.
Jun 26, 2025
2 Resources
0 Stars
Publicly accessible

Utah FORGE: Induced Seismicity Mitigation Plan

This is the current induced seismicity mitigation plan (ISMP) for the Utah FORGE project. Information that was collected during Phases 1 and 2 of the Utah FORGE project has been incorporated, as have literature searches and risk assessments. The purpose of this report is to identi...
Utah, U. et al Energy and Geoscience Institute at the University of Utah
Dec 30, 2020
2 Resources
0 Stars
Publicly accessible

Utah FORGE: 2023 Induced Seismicity Mitigation Plan

This is the updated Utah FORGE Phase 3B induced seismicity mitigation plan (ISMP) covering the general Utah FORGE area. This new version incorporates newly collected seismic data, including data collected during the 2022 stimulation and a probabilistic seismic hazard assessment (...
Pankow, K. et al University of Utah Seismograph Stations
Aug 09, 2023
1 Resources
0 Stars
Publicly accessible

SeaRAY WEC Preliminary Design and Test Planning

The SeaRAY is a deployable power system for maritime sensors, monitoring equipment, communications, unmanned underwater vehicles, and other similar payloads. This project is to design, deliver, and test a prototype low-power WEC that lowers the total cost of ownership and provides...
Hammagren, E. et al Columbia Power Technologies, Inc.
May 18, 2020
4 Resources
0 Stars
Publicly accessible

M3 Wave DMP/APEX WEC 1:10 Scale Preliminary Tank Test Plan

This is a preliminary test plan for testing of the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX," at Hinsdale Wave Research Laboratory at Oregon State University. Additional logistical details and instrumentation specifics will be added as engi...
Delos-Reyes, M. and Morrow, M. M3 Wave
Feb 23, 2017
1 Resources
0 Stars
Publicly accessible

Azura Advanced Controls 1/15th Scale Wave Tank Testing

Experimental data from the wave tank test of the Advanced control systems developed by Northwest Energy Innovations (NWEI) for the Azura at the University of Maine in Orono (UMO). Summary data is included utilizing the WEC Lab Testing Content Model v2.1. All raw and processed expe...
Ling, B. Northwest Energy Innovations
Feb 02, 2018
10 Resources
0 Stars
Publicly accessible

Advanced TidGen Power System Environmental Assessment

The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. et al Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible

Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011

This is the first project report and induced seismicity mitigation plan for the Newberry Enhanced Geothermal Systems (EGS) Demonstration project. The primary objectives of this first phase were to obtain necessary permits and comply with all regulations, including NEPA, communica...
Cladouhos, T. et al AltaRock Energy Inc
May 05, 2024
4 Resources
0 Stars
Publicly accessible

Northwest National Marine Renewable Energy Center, OR Project Plans

Plans for Northwest National Marine Renewable Energy Center (NNMREC) Project. Mobile Ocean Test Berth (MOTB) plans PMEC-SETS Plans
Hellin, D. Northwest National Marine Renewable Energy Center
Jun 29, 2016
20 Resources
0 Stars
Publicly accessible

Triton: Survivability Enhancement of a Multi-Mode Point Absorber

The overall goal of this project was to design and validate a survival mode for the Triton WEC that allows for a reduction in peak loads, while simultaneously allowing for a reduction of capital cost due to the elimination of overdesign to account for uncertainty. In addition, the...
Mundon, T. and Rosenberg, B. Oscilla Power, Inc.
Sep 28, 2018
11 Resources
0 Stars
Publicly accessible

CalWave Design For PacWave Preliminary Design Phase Project Management Plan

The project objectives for CalWave's deployment at PacWave are distinguished by the Preliminary Design Phase and the Detailed Design Phase. For the Preliminary Design Phase, the Project Management Plan outlines the project objectives, broader impacts, project tasks and timeline, c...
Boerner, T. et al CalWave Power Technologies Inc.
Feb 01, 2021
1 Resources
0 Stars
Publicly accessible

M3 Wave DMP/APEX WEC 1:50 Small Scale Tank Testing Plan

Detailed laboratory test plan for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX." Includes test points, materials and methods, and sensors/telemetry to be used. Includes schematics of test apparatus and sensor type and locations.
Delos-Reyes, M. and Morrow, M. M3 Wave
Feb 17, 2017
1 Resources
0 Stars
Publicly accessible

CalWave Revised IO&M Plan CalWave Open Water Demo

Revised IO&M Plan for CalWave's open water demonstration at Scripps Institution of Oceanography for the open water demonstration to be conducted in collaboration with University of California, San Diego (UCSD) near the Scripps Institute of Oceanography (SIO) pier, in a water dept...
Petcovic, D. et al CalWave Power Technologies Inc.
Jun 02, 2020
1 Resources
0 Stars
Publicly accessible
12345Next >>
  • About the Open Energy Data Initiative
  • Partners & Sponsors
  • Disclaimers
  • Developer Services
  • The OEDI Data Lake is a centralized repository of datasets aggregated from the U.S. Department of Energy’s Programs, Offices, and National Laboratories.
  • Content is available under Creative Commons Attribution 4.0 unless otherwise noted.

Privacy Policy Notification

This site uses cookies to store and share user preferences with other OpenEI sites, and uses Google Analytics to collect anonymous user information such as which pages are visited, for how often, and what searches or other webpages may have led users here. You can prevent Google Analytics from recognizing you on return visits to this site by disabling cookies on your browser or by installing a Google Analytics Opt-out Browser Add-on. By clicking "Accept" you agree this site can store cookies on your device and disclose information to OpenEI and Google Analytics in accordance with our privacy policy.

OpenEI Privacy Policy Google Analytics Terms of Service