Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011
This is the first project report and induced seismicity mitigation plan for the Newberry Enhanced Geothermal Systems (EGS) Demonstration project. The primary objectives of this first phase were to obtain necessary permits and comply with all regulations, including NEPA, communicate with the public, regulators and other stakeholders, develop a geologic model by evaluating current geoscience data and characterizing existing wells, supplemented by additional injection test and wellbore survey information, and formulate a detailed stimulation plan for the following project phases. Also attached here are reports on the successive stimulation phases of the project.
Citation Formats
TY - DATA
AB - This is the first project report and induced seismicity mitigation plan for the Newberry Enhanced Geothermal Systems (EGS) Demonstration project. The primary objectives of this first phase were to obtain necessary permits and comply with all regulations, including NEPA, communicate with the public, regulators and other stakeholders, develop a geologic model by evaluating current geoscience data and characterizing existing wells, supplemented by additional injection test and wellbore survey information, and formulate a detailed stimulation plan for the following project phases. Also attached here are reports on the successive stimulation phases of the project.
AU - Cladouhos, Trenton
A2 - Petty, Susan
A3 - Iovenitti, Joe
A4 - Callahan, Owen
A5 - Osborn, William
A6 - Nofziger, Laura
A7 - Sonnenthal, Eric
DB - Open Energy Data Initiative (OEDI)
DP - Open EI | National Renewable Energy Laboratory
DO -
KW - geothermal
KW - energy
KW - newberry
KW - EGS
KW - demonstration
KW - volcano
KW - AltaRock
KW - Oregon
KW - geology
KW - geologic model
KW - conceptual resource model
KW - seismicity
KW - induced seismicity
KW - mitigation
KW - maximum magnitude
KW - in situ stress
KW - permitting
KW - stimulation
KW - reservoir characterization
KW - drilling plan
KW - well testing
KW - risk mitigation
KW - reporting
LA - English
DA - 2024/05/05
PY - 2024
PB - AltaRock Energy Inc
T1 - Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011
UR - https://data.openei.org/submissions/7676
ER -
Cladouhos, Trenton, et al. Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011. AltaRock Energy Inc, 5 May, 2024, GDR. https://gdr.openei.org/submissions/1599.
Cladouhos, T., Petty, S., Iovenitti, J., Callahan, O., Osborn, W., Nofziger, L., & Sonnenthal, E. (2024). Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011. [Data set]. GDR. AltaRock Energy Inc. https://gdr.openei.org/submissions/1599
Cladouhos, Trenton, Susan Petty, Joe Iovenitti, Owen Callahan, William Osborn, Laura Nofziger, and Eric Sonnenthal. Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011. AltaRock Energy Inc, May, 5, 2024. Distributed by GDR. https://gdr.openei.org/submissions/1599
@misc{OEDI_Dataset_7676,
title = {Newberry EGS Demonstration: Initial Project Report and Induced Seismicity Mitigation Plan, 2011},
author = {Cladouhos, Trenton and Petty, Susan and Iovenitti, Joe and Callahan, Owen and Osborn, William and Nofziger, Laura and Sonnenthal, Eric},
abstractNote = {This is the first project report and induced seismicity mitigation plan for the Newberry Enhanced Geothermal Systems (EGS) Demonstration project. The primary objectives of this first phase were to obtain necessary permits and comply with all regulations, including NEPA, communicate with the public, regulators and other stakeholders, develop a geologic model by evaluating current geoscience data and characterizing existing wells, supplemented by additional injection test and wellbore survey information, and formulate a detailed stimulation plan for the following project phases. Also attached here are reports on the successive stimulation phases of the project.},
url = {https://gdr.openei.org/submissions/1599},
year = {2024},
howpublished = {GDR, AltaRock Energy Inc, https://gdr.openei.org/submissions/1599},
note = {Accessed: 2025-05-03}
}
Details
Data from May 5, 2024
Last updated Jul 9, 2024
Submitted May 5, 2024
Organization
AltaRock Energy Inc
Contact
Trenton Cladouhos
206.605.1948
Authors
Original Source
https://gdr.openei.org/submissions/1599Research Areas
Keywords
geothermal, energy, newberry, EGS, demonstration, volcano, AltaRock, Oregon, geology, geologic model, conceptual resource model, seismicity, induced seismicity, mitigation, maximum magnitude, in situ stress, permitting, stimulation, reservoir characterization, drilling plan, well testing, risk mitigation, reportingDOE Project Details
Project Name Newberry EGS Demonstration
Project Lead Lauren Boyd
Project Number EE0002777