Search OEDI Data
Showing results 1 - 13 of 13.
Show
results per page.
Order by:
Available Now:
Research Areas
Accessibility
Data Type
Organization
Source
Lab Homes
This dataset includes processed data from the Lab Homes (LH) Test Facility located on the PNNL campus in Richland, WA. This a set of 2 identical homes that allow for the side-by-side comparison/performance evaluation of different technologies under the same weather at any given ti...
Chandan, V. and Luo, N. Building Technologies Office (BTO)
Sep 14, 2022
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
High-Fidelity Building Emulator
This dataset provides high-fidelity time series data for an emulated commercial office building sited in the Chicago, IL area during a Typical Meteorological Year (TMY). This dataset consists of air-side HVAC measurements and control inputs, and it includes normal operations as w...
Bakker, C. et al Building Technologies Office (BTO)
Jun 15, 2022
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Lawrence Berkeley National Laboratory Building 59, Berkeley, California
The Building 59 at the Lawrence Berkeley National Laboratory is a medium-sized office building with two office floors, one mechanical equipment floor, and one floor for NERSC data and computing center. The dataset only covers the two office floors. The building management system m...
Hong, T. and Luo, N. Building Technologies Office (BTO)
Jul 28, 2021
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Lawrence Berkeley National Laboratory Building 59, Berkeley, California
The Building 59 at the Lawrence Berkeley National Laboratory is a medium-sized office building with two office floors, one mechanical equipment floor, and one floor for NERSC data and computing center. The dataset only covers the two office floors. The building management system m...
Hong, T. and Luo, N. Building Technologies Office (BTO)
Nov 01, 2021
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Lawrence Berkeley National Laboratory Building 59, Berkeley, California
The Building 59 at the Lawrence Berkeley National Laboratory is a medium-sized office building with two office floors, one mechanical equipment floor, and one floor for NERSC data and computing center. The dataset only covers the two office floors. The building management system m...
Hong, T. and Luo, N. Building Technologies Office (BTO)
Nov 03, 2021
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Lawrence Berkeley National Laboratory Building 59, Berkeley, California
The Building 59 at the Lawrence Berkeley National Laboratory is a medium-sized office building with two office floors, one mechanical equipment floor, and one floor for NERSC data and computing center. The dataset only covers the two office floors. The building management system m...
Hong, T. and Luo, N. Building Technologies Office (BTO)
Feb 22, 2022
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Lawrence Berkeley National Laboratory Building 59, Berkeley, California
Building 59 is a medium-sized office building with two office floors, one mechanical equipment floor, and one floor for NERSC data and computing center. The dataset only covers the two office floors. The building management system monitors and archives building-level electricity u...
Hong, T. and Luo, N. Building Technologies Office (BTO)
Mar 13, 2022
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Demonstration Site {city}, MA
The PV-GEMS whole building retrofit features a small, grid-independent photovoltaic (PV) system designed to partially power a high efficiency heat pump water heater, which replaces the home’s existing water heater, and a high efficiency minisplit heat pump, acting as an enhancem...
Pilet, T. Building Technologies Office (BTO)
Sep 14, 2022
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Systems Engineering Building, Richland, Washington
This dataset includes processed and raw data from the building management system for the Systems Engineering Building (SEB) located on the Pacific Northwest National Laboratory campus in Richland, Washington. SEB is a Leadership in Energy and Environmental Design (LEED) gold-certi...
Chandan, V. et al Building Technologies Office (BTO)
Jul 28, 2021
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Systems Engineering Building, Richland, Washington
This dataset includes processed and raw data from the building management system for the Systems Engineering Building (SEB) located on the Pacific Northwest National Laboratory campus in Richland, Washington. SEB is a Leadership in Energy and Environmental Design (LEED) gold-certi...
Chandan, V. et al Building Technologies Office (BTO)
Nov 01, 2021
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Systems Engineering Building, Richland, Washington
This dataset includes processed and raw data from the building management system for the Systems Engineering Building (SEB) located on the Pacific Northwest National Laboratory campus in Richland, Washington. SEB is a Leadership in Energy and Environmental Design (LEED) gold-certi...
Chandan, V. et al Building Technologies Office (BTO)
Nov 03, 2021
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Systems Engineering Building, Richland, Washington
This dataset includes processed and raw data from the building management system for the Systems Engineering Building (SEB) located on the Pacific Northwest National Laboratory campus in Richland, Washington. SEB is a Leadership in Energy and Environmental Design (LEED) gold-certi...
Chandan, V. et al Building Technologies Office (BTO)
Feb 22, 2022
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Systems Engineering Building, Richland, Washington
This dataset includes processed and raw data from the building management system for the Systems Engineering Building (SEB) located on the Pacific Northwest National Laboratory campus in Richland, Washington. SEB is a Leadership in Energy and Environmental Design (LEED) gold-certi...
Chandan, V. et al Building Technologies Office (BTO)
Mar 13, 2022
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible