Search OEDI Data
Showing results 1 - 5 of 5.
Show
results per page.
Order by:
Available Now:
Research Areas
Accessibility
Data Type
Organization
Source
Utah FORGE: Well 16A(78)-32 Planned Trajectory
This submission includes an Excel spreadsheet containing the Utah FORGE deep well 16A(78)-32 planned trajectory including UTM coordinates, elevations, and depths from the well head to the toe. This proposed new injection well is expected to descend vertically to a depth of approxi...
Podgorney, R. and Nash, G. Idaho National Laboratory
Mar 24, 2020
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Utah FORGE Phase 3 Native State Model: 2022 Update
This is the Phase 3 native state model update. The Phase 3 numerical model represents a significant subsurface volume below the FORGE site footprint. The model domain of 4.0 km x 4.0 km x 4.2 km is located approximately between depths of 4000 to 4200 meters below land surface. Thi...
Podgorney, R. and Liu, R. Idaho National Laboratory
Jul 29, 2022
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Utah FORGE: Well 58-32 Injection Test Data
This submission contains pressure and flow time series data from the reservoir testing of Well 58-32. These activities were part of the Utah FORGE Phase 2B site suitability confirmatory testing.
Podgorney, R. and McLennan, J. Idaho National Laboratory
Dec 07, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Utah FORGE: Drilling Data for Student Competition
Diagnostic drilling data (Pason log files) from Well 58-32 (previously labeled MU-ESW1), which was drilled near Milford Utah during Phase 2B of the FORGE Project to confirm geothermal reservoir characteristics met requirements for the final FORGE site. This dataset includes both ...
Podgorney, R. et al Idaho National Laboratory
Dec 07, 2018
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Utah FORGE: Well Data for Student Competition
Well 58-32 (previously labeled MU-ESW1) was drilled near Milford Utah during Phase 2B of the FORGE Project to confirm geothermal reservoir characteristics met requirements for the final FORGE site.
Well Accord-1 was drilled decades ago for geothermal exploration purposes. While ...
Podgorney, R. et al Idaho National Laboratory
Dec 07, 2018
12 Resources
0 Stars
Publicly accessible
12 Resources
0 Stars
Publicly accessible