Search OEDI Data
Showing results 1 - 4 of 4.
Show
results per page.
Order by:
Available Now:
Research Areas
Accessibility
Data Type
Organization
Source
WISE-CASING: Frequency Domain EM Data from Cymric Oil Field, CA
Cymric oil field frequency domain electromagnetic (FEM) data with two parts of data labeled Part 1 and Part 2. Part 1 utilizes an electrical source line parallel to the receiver line, while Part 2 utilizes an electrical source line at a 75 deg angle to the receiver line. Data are ...
Wang, J. et al Lawrence Berkeley National Laboratory
Apr 30, 2019
11 Resources
0 Stars
Publicly accessible
11 Resources
0 Stars
Publicly accessible
Extraction/Injection Well Design for Deep Direct Use at University of Illinois at Urban-Champaign
The large scale Deep Direct Use (DDU) geothermal project in the low temperature environment of the Illinois Basin requires drilling and completing two wells. One well would be the extraction (producing) well and would be built to deliver a flow rate of approximately 6000 barrels ...
Kirksey, J. and Lu, Y. University of Illinois
Mar 31, 2019
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
WISE-CASING: DC Simulation at Containment and Monitoring Institute (CaMI), Calgary, Canada
For the model calculation we applied EM3D using completion diagram of CaMI site and a background resistivity consistent with the borehole logs. It was also important to use the accurate position of the return electrode. We note that for the data fit the code also incorporated we...
Wang, J. and Wilt, M. Lawrence Berkeley National Laboratory
Apr 30, 2019
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
UNH TDP Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary
This data was collected between October 12 and December 15 of 2021 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). This data set includes over 29 days of grid connected turbine operation during this 65 day time f...
Wosnik, M. et al National Renewable Energy Laboratory
Dec 21, 2021
30 Resources
0 Stars
Publicly accessible
30 Resources
0 Stars
Publicly accessible