Translated System Requirements into PTO Design Requirements (in addition to Component-level metrics) for the HydroAir Power Take Off System
Includes Maximum Cost, Critical Dimensions and Weights, Damping Curve, Rotor Speed Profile Changes, Mechanical Power for a given pressure and airflow, Turbine rpm range and power, Generator input torque, Torque speed curves/profile, Generated electrical power for given input torque, Generated Load Cycles, Variation in generator speed, Conversion efficiencies for pressure to mechanical, mechanical to electrical: losses due to conditioning, Generator temperatures, Vibration/acceleration, Operating angle, Shaft strain, and Noise level.
Citation Formats
TY - DATA
AB - Includes Maximum Cost, Critical Dimensions and Weights, Damping Curve, Rotor Speed Profile Changes, Mechanical Power for a given pressure and airflow, Turbine rpm range and power, Generator input torque, Torque speed curves/profile, Generated electrical power for given input torque, Generated Load Cycles, Variation in generator speed, Conversion efficiencies for pressure to mechanical, mechanical to electrical: losses due to conditioning, Generator temperatures, Vibration/acceleration, Operating angle, Shaft strain, and Noise level.
AU - Natanzi, Shahab
A2 - Hall, Russell
DB - Open Energy Data Initiative (OEDI)
DP - Open EI | National Laboratory of the Rockies
DO -
KW - MHK
KW - Marine
KW - Hydrokinetic
KW - energy
KW - power
KW - Hydrokinetic Marine energy power
KW - PTO
KW - power take off
KW - WEC
KW - wave energy
KW - system requirments
KW - operating conditions
KW - production
KW - dimensions
KW - efficiency
KW - design requirements
KW - design
LA - English
DA - 2020/10/02
PY - 2020
PB - Siemens Government Technologies, Inc.
T1 - Translated System Requirements into PTO Design Requirements (in addition to Component-level metrics) for the HydroAir Power Take Off System
UR - https://data.openei.org/submissions/8544
ER -
Natanzi, Shahab, and Russell Hall. Translated System Requirements into PTO Design Requirements (in addition to Component-level metrics) for the HydroAir Power Take Off System. Siemens Government Technologies, Inc., 2 October, 2020, MHKDR. https://mhkdr.openei.org/submissions/333.
Natanzi, S., & Hall, R. (2020). Translated System Requirements into PTO Design Requirements (in addition to Component-level metrics) for the HydroAir Power Take Off System. [Data set]. MHKDR. Siemens Government Technologies, Inc.. https://mhkdr.openei.org/submissions/333
Natanzi, Shahab and Russell Hall. Translated System Requirements into PTO Design Requirements (in addition to Component-level metrics) for the HydroAir Power Take Off System. Siemens Government Technologies, Inc., October, 2, 2020. Distributed by MHKDR. https://mhkdr.openei.org/submissions/333
@misc{OEDI_Dataset_8544,
title = {Translated System Requirements into PTO Design Requirements (in addition to Component-level metrics) for the HydroAir Power Take Off System},
author = {Natanzi, Shahab and Hall, Russell},
abstractNote = {Includes Maximum Cost, Critical Dimensions and Weights, Damping Curve, Rotor Speed Profile Changes, Mechanical Power for a given pressure and airflow, Turbine rpm range and power, Generator input torque, Torque speed curves/profile, Generated electrical power for given input torque, Generated Load Cycles, Variation in generator speed, Conversion efficiencies for pressure to mechanical, mechanical to electrical: losses due to conditioning, Generator temperatures, Vibration/acceleration, Operating angle, Shaft strain, and Noise level.},
url = {https://mhkdr.openei.org/submissions/333},
year = {2020},
howpublished = {MHKDR, Siemens Government Technologies, Inc., https://mhkdr.openei.org/submissions/333},
note = {Accessed: 2026-05-17}
}
Details
Data from Oct 2, 2020
Last updated Oct 2, 2025
Submitted Jul 26, 2021
Organization
Siemens Government Technologies, Inc.
Contact
Paul Jenicek
720.327.6867
Authors
Original Source
https://mhkdr.openei.org/submissions/333Research Areas
Keywords
MHK, Marine, Hydrokinetic, energy, power, Hydrokinetic Marine energy power, PTO, power take off, WEC, wave energy, system requirments, operating conditions, production, dimensions, efficiency, design requirements, designDOE Project Details
Project Name HydroAir Power Take Off System
Project Lead Erik Mauer
Project Number EE0006609