HERO WEC V1.0 - Electrical PTO Deployment Data and Analysis
This submission includes the processed and raw field electrical data from NREL's August 2022 HERO WEC (hydraulic and electric reverse osmosis wave energy converter) deployment at Jennette's Pier for the electrical PTO (power take-off).
Citation Formats
TY - DATA
AB - This submission includes the processed and raw field electrical data from NREL's August 2022 HERO WEC (hydraulic and electric reverse osmosis wave energy converter) deployment at Jennette's Pier for the electrical PTO (power take-off).
AU - Nakhai, Aryana
A2 - Jenne, Scott
A3 - Driscoll, Frederick
DB - Open Energy Data Initiative (OEDI)
DP - Open EI | National Renewable Energy Laboratory
DO - 10.15473/1988170
KW - MHK
KW - Marine
KW - Hydrokinetic
KW - energy
KW - power
KW - point absorber
KW - WEC
KW - reverse osmosis
KW - sim model
KW - raw data
KW - processed data
KW - Outer Banks
KW - North Carolina
KW - hydraulic PTO
LA - English
DA - 2022/08/12
PY - 2022
PB - National Renewable Energy Laboratory
T1 - HERO WEC V1.0 - Electrical PTO Deployment Data and Analysis
UR - https://doi.org/10.15473/1988170
ER -
Nakhai, Aryana, et al. HERO WEC V1.0 - Electrical PTO Deployment Data and Analysis. National Renewable Energy Laboratory, 12 August, 2022, MHKDR. https://doi.org/10.15473/1988170.
Nakhai, A., Jenne, S., & Driscoll, F. (2022). HERO WEC V1.0 - Electrical PTO Deployment Data and Analysis. [Data set]. MHKDR. National Renewable Energy Laboratory. https://doi.org/10.15473/1988170
Nakhai, Aryana, Scott Jenne, and Frederick Driscoll. HERO WEC V1.0 - Electrical PTO Deployment Data and Analysis. National Renewable Energy Laboratory, August, 12, 2022. Distributed by MHKDR. https://doi.org/10.15473/1988170
@misc{OEDI_Dataset_8057,
title = {HERO WEC V1.0 - Electrical PTO Deployment Data and Analysis},
author = {Nakhai, Aryana and Jenne, Scott and Driscoll, Frederick},
abstractNote = {This submission includes the processed and raw field electrical data from NREL's August 2022 HERO WEC (hydraulic and electric reverse osmosis wave energy converter) deployment at Jennette's Pier for the electrical PTO (power take-off).},
url = {https://mhkdr.openei.org/submissions/487},
year = {2022},
howpublished = {MHKDR, National Renewable Energy Laboratory, https://doi.org/10.15473/1988170},
note = {Accessed: 2025-05-03},
doi = {10.15473/1988170}
}
https://dx.doi.org/10.15473/1988170
Details
Data from Aug 12, 2022
Last updated Jul 6, 2023
Submitted Jun 5, 2023
Organization
National Renewable Energy Laboratory
Contact
Aryana Nakhai
Authors
Original Source
https://mhkdr.openei.org/submissions/487Research Areas
Keywords
MHK, Marine, Hydrokinetic, energy, power, point absorber, WEC, reverse osmosis, sim model, raw data, processed data, Outer Banks, North Carolina, hydraulic PTODOE Project Details
Project Name Wave-Powered Desalination Deployment & Analysis
Project Lead Simon Gore
Project Number FY22 AOP 2.2.6.404