Solar permitting, inspection, and interconnection cycletimes and requirements
Sixteen small-to-large residential PV installers submitted project-level data for analysis, which included timestamps for major components of the permitting, inspection, and interconnection process as well as contract and installation dates. NREL calculated median timelines for these processes across the authorities having jurisdiction (AHJs) and utilities represented in the data. Also included are relevant permitting requirements for AHJs and interconnection process requirements for utilities. This dataset represents the underlying results shown in the Solar Time-based Residential Analytics and Cycle time Estimator (Solar TRACE) viewer. This dataset has been reviewed but errors may exist and it may not be comprehensive. Errors in the sources (e.g., AHJ permitting requirements lists from data partners) may be duplicated in the dataset.
Citation Formats
Strategic Energy Analysis Center. (2021). Solar permitting, inspection, and interconnection cycletimes and requirements [data set]. Retrieved from e588f813-b64e-4d4e-aaf2-04e09e88db31.
Cook, , Cruce, , Fekete, , and Dong, . Solar permitting, inspection, and interconnection cycletimes and requirements. United States: N.p., 31 Mar, 2021. Web. e588f813-b64e-4d4e-aaf2-04e09e88db31.
Cook, , Cruce, , Fekete, , & Dong, . Solar permitting, inspection, and interconnection cycletimes and requirements. United States. e588f813-b64e-4d4e-aaf2-04e09e88db31
Cook, , Cruce, , Fekete, , and Dong, . 2021. "Solar permitting, inspection, and interconnection cycletimes and requirements". United States. e588f813-b64e-4d4e-aaf2-04e09e88db31.
@div{oedi_6364, title = {Solar permitting, inspection, and interconnection cycletimes and requirements}, author = {Cook, , Cruce, , Fekete, , and Dong, .}, abstractNote = {Sixteen small-to-large residential PV installers submitted project-level data for analysis, which included timestamps for major components of the permitting, inspection, and interconnection process as well as contract and installation dates. NREL calculated median timelines for these processes across the authorities having jurisdiction (AHJs) and utilities represented in the data. Also included are relevant permitting requirements for AHJs and interconnection process requirements for utilities. This dataset represents the underlying results shown in the Solar Time-based Residential Analytics and Cycle time Estimator (Solar TRACE) viewer. This dataset has been reviewed but errors may exist and it may not be comprehensive. Errors in the sources (e.g., AHJ permitting requirements lists from data partners) may be duplicated in the dataset.}, doi = {}, url = {e588f813-b64e-4d4e-aaf2-04e09e88db31}, journal = {}, number = , volume = , place = {United States}, year = {2021}, month = {03}}
Details
Data from Mar 31, 2021
Last updated Dec 18, 2024
Submitted Mar 31, 2021
Organization
Strategic Energy Analysis Center
Contact
Jesse Cruce
Authors
Original Source
e588f813-b64e-4d4e-aaf2-04e09e88db31Research Areas
Keywords
rooftop solar, distributed solar PV, Residential Solar, solar permitting, residential storage, distributed storageDOE Project Details
Project Name Analytics for Residential PV from Permit to Interconnect
Project Number DE35658