Utah FORGE Project 3-2417: Meteorological Data During 2023 Completion/Circulation
This preliminary data archive includes meteorological data recorded at the Utah FORGE facility over the period of time including the completion/cementing of well 16B(78)-32 and the initial 2023 circulation test, largely occurring in June/July/August of 2023. This information may prove useful for understanding seismic and other instrumentation responses during these activities. The meteorological station was installed June 23rd, 2023 during drilling; the circulation test occurred in mid July of 2023 (July 4-19). The included files span this period. All sensors were installed at the 16 pad and hence reflect weather state at the site. This dataset was acquired by the FOGMORE R&D project (Fiber Optic MOnitoring for Reservoir Evolution), Utah FORGE R&D Project 3-2417.
Citation Formats
Rice University. (2024). Utah FORGE Project 3-2417: Meteorological Data During 2023 Completion/Circulation [data set]. Retrieved from https://dx.doi.org/10.15121/2371678.
Ajo-Franklin, Jonathan. Utah FORGE Project 3-2417: Meteorological Data During 2023 Completion/Circulation. United States: N.p., 10 Jun, 2024. Web. doi: 10.15121/2371678.
Ajo-Franklin, Jonathan. Utah FORGE Project 3-2417: Meteorological Data During 2023 Completion/Circulation. United States. https://dx.doi.org/10.15121/2371678
Ajo-Franklin, Jonathan. 2024. "Utah FORGE Project 3-2417: Meteorological Data During 2023 Completion/Circulation". United States. https://dx.doi.org/10.15121/2371678. https://gdr.openei.org/submissions/1612.
@div{oedi_6073, title = {Utah FORGE Project 3-2417: Meteorological Data During 2023 Completion/Circulation}, author = {Ajo-Franklin, Jonathan.}, abstractNote = {This preliminary data archive includes meteorological data recorded at the Utah FORGE facility over the period of time including the completion/cementing of well 16B(78)-32 and the initial 2023 circulation test, largely occurring in June/July/August of 2023. This information may prove useful for understanding seismic and other instrumentation responses during these activities. The meteorological station was installed June 23rd, 2023 during drilling; the circulation test occurred in mid July of 2023 (July 4-19). The included files span this period. All sensors were installed at the 16 pad and hence reflect weather state at the site. This dataset was acquired by the FOGMORE R&D project (Fiber Optic MOnitoring for Reservoir Evolution), Utah FORGE R&D Project 3-2417.}, doi = {10.15121/2371678}, url = {https://gdr.openei.org/submissions/1612}, journal = {}, number = , volume = , place = {United States}, year = {2024}, month = {06}}
https://dx.doi.org/10.15121/2371678
Details
Data from Jun 10, 2024
Last updated Jun 12, 2024
Submitted Jun 10, 2024
Organization
Rice University
Contact
Jonathan Ajo-Franklin
510.735.4350
Authors
Original Source
https://gdr.openei.org/submissions/1612Research Areas
Keywords
geothermal, energy, Utah, Utah FORGE, EGS, Enhanced Geothermal, meteorological data, meteorology, Well 78-16, circulation, completion, temperature, wind, humidity, precipitation, time series, raw data, calibration, instrument calibration, 78-16DOE Project Details
Project Name Utah FORGE
Project Lead Lauren Boyd
Project Number EE0007080