"Womp Womp! Your browser does not support canvas :'("

Utah FORGE: Well 16B(78)-32 Logs from Schlumberger Technologies

Publicly accessible License 

This dataset is a collection of well logs provided by Schlumberger Technologies from the Utah FORGE well 16B(78)-32 drilling project. Information here includes critical borehole information collected by an ultrasonic borehole imager (UBI) and a fullbore formation microimager (FMI). Well 16B(78)-32 serves as the production well for reservoir creation, fluid circulation, and demonstration of heat extraction for the FORGE project. It has been drilled as a doublet approximately 300 feet parallel to and above the injection well 16A(78)-32. The total depth measured 10,947 feet and the vertical depth measured 8,357 feet.

Citation Formats

Energy and Geoscience Institute at the University of Utah. (2023). Utah FORGE: Well 16B(78)-32 Logs from Schlumberger Technologies [data set]. Retrieved from https://dx.doi.org/10.15121/2001059.
Export Citation to RIS
May, Doug, Jones, Dave. Utah FORGE: Well 16B(78)-32 Logs from Schlumberger Technologies. United States: N.p., 14 Sep, 2023. Web. doi: 10.15121/2001059.
May, Doug, Jones, Dave. Utah FORGE: Well 16B(78)-32 Logs from Schlumberger Technologies. United States. https://dx.doi.org/10.15121/2001059
May, Doug, Jones, Dave. 2023. "Utah FORGE: Well 16B(78)-32 Logs from Schlumberger Technologies". United States. https://dx.doi.org/10.15121/2001059. https://gdr.openei.org/submissions/1531.
@div{oedi_6013, title = {Utah FORGE: Well 16B(78)-32 Logs from Schlumberger Technologies}, author = {May, Doug, Jones, Dave.}, abstractNote = {This dataset is a collection of well logs provided by Schlumberger Technologies from the Utah FORGE well 16B(78)-32 drilling project. Information here includes critical borehole information collected by an ultrasonic borehole imager (UBI) and a fullbore formation microimager (FMI). Well 16B(78)-32 serves as the production well for reservoir creation, fluid circulation, and demonstration of heat extraction for the FORGE project. It has been drilled as a doublet approximately 300 feet parallel to and above the injection well 16A(78)-32. The total depth measured 10,947 feet and the vertical depth measured 8,357 feet.}, doi = {10.15121/2001059}, url = {https://gdr.openei.org/submissions/1531}, journal = {}, number = , volume = , place = {United States}, year = {2023}, month = {09}}
https://dx.doi.org/10.15121/2001059

Details

Data from Sep 14, 2023

Last updated Nov 3, 2023

Submitted Sep 16, 2023

Organization

Energy and Geoscience Institute at the University of Utah

Contact

John McLennan

801.587.7925

Authors

Doug May

Schlumberger Technologies

Dave Jones

Schlumberger Technologies

Research Areas

DOE Project Details

Project Name Utah FORGE

Project Lead Lauren Boyd

Project Number EE0007080

Share

Submission Downloads