Utility-Scale Solar, 2021 Edition
Berkeley Labs "Utility-Scale Solar", 2021 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2020, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.
Citation Formats
Lawrence Berkeley National Lab. (2021). Utility-Scale Solar, 2021 Edition [data set]. Retrieved from https://dx.doi.org/10.25984/1838612.
Bolinger, Mark, Seel, Joachim, Warner, Cody, and Robson, Dana. Utility-Scale Solar, 2021 Edition. United States: N.p., 30 Sep, 2021. Web. doi: 10.25984/1838612.
Bolinger, Mark, Seel, Joachim, Warner, Cody, & Robson, Dana. Utility-Scale Solar, 2021 Edition. United States. https://dx.doi.org/10.25984/1838612
Bolinger, Mark, Seel, Joachim, Warner, Cody, and Robson, Dana. 2021. "Utility-Scale Solar, 2021 Edition". United States. https://dx.doi.org/10.25984/1838612. https://data.openei.org/submissions/4526.
@div{oedi_4526, title = {Utility-Scale Solar, 2021 Edition}, author = {Bolinger, Mark, Seel, Joachim, Warner, Cody, and Robson, Dana.}, abstractNote = {Berkeley Labs "Utility-Scale Solar", 2021 Edition presents analysis of empirical plant-level data from the U.S. fleet of ground-mounted photovoltaic (PV), PV+battery, and concentrating solar-thermal power (CSP) plants with capacities exceeding 5 MWAC. While focused on key developments in 2020, this report explores trends in deployment, technology, capital and operating costs, capacity factors, the levelized cost of solar energy (LCOE), power purchase agreement (PPA) prices, wholesale market value, and interconnection queue data.}, doi = {10.25984/1838612}, url = {https://data.openei.org/submissions/4526}, journal = {}, number = , volume = , place = {United States}, year = {2021}, month = {09}}
https://dx.doi.org/10.25984/1838612
Details
Data from Sep 30, 2021
Last updated Jan 7, 2022
Submitted Oct 21, 2021
Organization
Lawrence Berkeley National Lab
Contact
Joachim Seel
510.486.5087
Authors
Research Areas
Keywords
energy, power, solar, utility-scale solar, Berkeley Lab, capital costs, capacity factors, LCOE, power purchase agreements, wholesale market value, utility scale, PV, concentrating solar-thermal power, CSP, Battery, PV battery, operating costs, costs, interconnection, interconnection queue, 2021DOE Project Details
Project Name Utility-Scale Solar
Project Number 34158