"Womp Womp! Your browser does not support canvas :'("

Utah FORGE Induced Seismicity Mitigation Plan

Publicly accessible License 

This is the current induced seismicity mitigation plan (ISMP) for the Utah FORGE project. Information that was collected during Phases 1 and 2 of the Utah FORGE project has been incorporated, as have literature searches and risk assessments. The purpose of this report is to identify and mitigate induced seismicity for the Utah FORGE Project. Mitigation includes preliminary screening, outreach, criteria for ground vibration and noise, data collection practices, and natural seismic hazard analysis. From this, the overall risk from the project was determined. This report is subject to change as new information comes to light.

Citation Formats

Energy and Geoscience Institute at the University of Utah. (2020). Utah FORGE Induced Seismicity Mitigation Plan [data set]. Retrieved from https://gdr.openei.org/submissions/1319.
Export Citation to RIS
Utah, University of, Pankow, Kristine, Rutledge, James, and Wannamaker, Phil. Utah FORGE Induced Seismicity Mitigation Plan . United States: N.p., 30 Dec, 2020. Web. https://gdr.openei.org/submissions/1319.
Utah, University of, Pankow, Kristine, Rutledge, James, & Wannamaker, Phil. Utah FORGE Induced Seismicity Mitigation Plan . United States. https://gdr.openei.org/submissions/1319
Utah, University of, Pankow, Kristine, Rutledge, James, and Wannamaker, Phil. 2020. "Utah FORGE Induced Seismicity Mitigation Plan ". United States. https://gdr.openei.org/submissions/1319.
@div{oedi_4126, title = {Utah FORGE Induced Seismicity Mitigation Plan }, author = {Utah, University of, Pankow, Kristine, Rutledge, James, and Wannamaker, Phil.}, abstractNote = {This is the current induced seismicity mitigation plan (ISMP) for the Utah FORGE project. Information that was collected during Phases 1 and 2 of the Utah FORGE project has been incorporated, as have literature searches and risk assessments. The purpose of this report is to identify and mitigate induced seismicity for the Utah FORGE Project. Mitigation includes preliminary screening, outreach, criteria for ground vibration and noise, data collection practices, and natural seismic hazard analysis. From this, the overall risk from the project was determined. This report is subject to change as new information comes to light.}, doi = {}, url = {https://gdr.openei.org/submissions/1319}, journal = {}, number = , volume = , place = {United States}, year = {2020}, month = {12}}

Details

Data from Dec 30, 2020

Last updated Jul 12, 2021

Submitted Jun 28, 2021

Organization

Energy and Geoscience Institute at the University of Utah

Contact

Joe Moore

801.585.6931

Authors

University of Utah

Energy and Geoscience Institute at the University of Utah

Kristine Pankow

University of Utah

James Rutledge

University of Utah

Phil Wannamaker

University of Utah

Research Areas

DOE Project Details

Project Name Utah FORGE

Project Lead Lauren Boyd

Project Number EE0007080

Share

Submission Downloads