Utah FORGE Induced Seismicity Mitigation Plan
This is the current induced seismicity mitigation plan (ISMP) for the Utah FORGE project. Information that was collected during Phases 1 and 2 of the Utah FORGE project has been incorporated, as have literature searches and risk assessments. The purpose of this report is to identify and mitigate induced seismicity for the Utah FORGE Project. Mitigation includes preliminary screening, outreach, criteria for ground vibration and noise, data collection practices, and natural seismic hazard analysis. From this, the overall risk from the project was determined. This report is subject to change as new information comes to light.
Citation Formats
Energy and Geoscience Institute at the University of Utah. (2020). Utah FORGE Induced Seismicity Mitigation Plan [data set]. Retrieved from https://gdr.openei.org/submissions/1319.
Utah, University of, Pankow, Kristine, Rutledge, James, and Wannamaker, Phil. Utah FORGE Induced Seismicity Mitigation Plan . United States: N.p., 30 Dec, 2020. Web. https://gdr.openei.org/submissions/1319.
Utah, University of, Pankow, Kristine, Rutledge, James, & Wannamaker, Phil. Utah FORGE Induced Seismicity Mitigation Plan . United States. https://gdr.openei.org/submissions/1319
Utah, University of, Pankow, Kristine, Rutledge, James, and Wannamaker, Phil. 2020. "Utah FORGE Induced Seismicity Mitigation Plan ". United States. https://gdr.openei.org/submissions/1319.
@div{oedi_4126, title = {Utah FORGE Induced Seismicity Mitigation Plan }, author = {Utah, University of, Pankow, Kristine, Rutledge, James, and Wannamaker, Phil.}, abstractNote = {This is the current induced seismicity mitigation plan (ISMP) for the Utah FORGE project. Information that was collected during Phases 1 and 2 of the Utah FORGE project has been incorporated, as have literature searches and risk assessments. The purpose of this report is to identify and mitigate induced seismicity for the Utah FORGE Project. Mitigation includes preliminary screening, outreach, criteria for ground vibration and noise, data collection practices, and natural seismic hazard analysis. From this, the overall risk from the project was determined. This report is subject to change as new information comes to light.}, doi = {}, url = {https://gdr.openei.org/submissions/1319}, journal = {}, number = , volume = , place = {United States}, year = {2020}, month = {12}}
Details
Data from Dec 30, 2020
Last updated Jul 12, 2021
Submitted Jun 28, 2021
Organization
Energy and Geoscience Institute at the University of Utah
Contact
Joe Moore
801.585.6931
Authors
Original Source
https://gdr.openei.org/submissions/1319Research Areas
Keywords
geothermal, energy, seismicity, induced seismicity, seismicity mitigation, Utah FORGE, induced seismicity mitigation plan, earthquakes, seismic, risk mitigation, risk, hazard, mitigation, earthquake, Utah, Mitigation plan, plan, geophysics, EGS, fault, faultsDOE Project Details
Project Name Utah FORGE
Project Lead Lauren Boyd
Project Number EE0007080