"Womp Womp! Your browser does not support canvas :'("

RivGen Open Water Installation Report

Publicly accessible License 

The purpose of the Open Water Deployment Report is to provide an overview of the installation of the Ocean Renewable Power Company (ORPC) RivGen 2.0 Power System in Igiugig, AK, in 2019 beginning with the transportation of the system to Igiugig and ending with the deployment of the device to the Kvichak River bottom.

Citation Formats

Igiugig Village Council. (2019). RivGen Open Water Installation Report [data set]. Retrieved from https://mhkdr.openei.org/submissions/317.
Export Citation to RIS
Tyler, Ryan. RivGen Open Water Installation Report. United States: N.p., 01 Nov, 2019. Web. https://mhkdr.openei.org/submissions/317.
Tyler, Ryan. RivGen Open Water Installation Report. United States. https://mhkdr.openei.org/submissions/317
Tyler, Ryan. 2019. "RivGen Open Water Installation Report". United States. https://mhkdr.openei.org/submissions/317.
@div{oedi_4119, title = {RivGen Open Water Installation Report}, author = {Tyler, Ryan.}, abstractNote = {The purpose of the Open Water Deployment Report is to provide an overview of the installation of the Ocean Renewable Power Company (ORPC) RivGen 2.0 Power System in Igiugig, AK, in 2019 beginning with the transportation of the system to Igiugig and ending with the deployment of the device to the Kvichak River bottom.}, doi = {}, url = {https://mhkdr.openei.org/submissions/317}, journal = {}, number = , volume = , place = {United States}, year = {2019}, month = {11}}

Details

Data from Nov 1, 2019

Last updated Jun 30, 2020

Submitted Feb 26, 2020

Organization

Igiugig Village Council

Contact

AlexAnna Salmon

907.533.3211

Authors

Ryan Tyler

ORPC Inc.

DOE Project Details

Project Name Next Generation MHK River Power System, Optimized for Performance, Durability, and Survivability

Project Lead Yana Shininger

Project Number EE0007348

Share

Submission Downloads