Kvichak River RISEC Project Resource Reconnaissance and Physical Characterization, Igiugig, AK
During the summer and fall of 2011 TerraSond Ltd. (TerraSond) completed a bathymetric survey and hydrokinetic energy assessment of the Kvichak River at Igiugig, Alaska. The purpose of this work was to characterize the initial site conditions for the design and installation of a hydrokinetic turbine to provide electric power for the village. There were six distinct phases of work for this project. The first was a literature review and investigation of prior surveys and hydrologic studies done in the area. The second, third, fourth, and fifth phases consisted of four field expeditions conducted over the summer and fall of 2011. These expeditions consisted of an initial reconnaissance, multi beam bathymetric surveys, flow velocity and discharge measurements, a survey of water levels, and detailed flow velocity studies. The final phase of the project was complete data reduction, and preparation of the final report with its accompanying map sheets and data packages.
This submission contains the final report for the Kvichak River RISEC Project in addition to weather data for Igiugig, AK, Summer 2015.
Citation Formats
Ocean Renewable Power Company. (2015). Kvichak River RISEC Project Resource Reconnaissance and Physical Characterization, Igiugig, AK [data set]. Retrieved from https://dx.doi.org/10.15473/1418354.
McEntee, Jarlath. Kvichak River RISEC Project Resource Reconnaissance and Physical Characterization, Igiugig, AK. United States: N.p., 01 Oct, 2015. Web. doi: 10.15473/1418354.
McEntee, Jarlath. Kvichak River RISEC Project Resource Reconnaissance and Physical Characterization, Igiugig, AK. United States. https://dx.doi.org/10.15473/1418354
McEntee, Jarlath. 2015. "Kvichak River RISEC Project Resource Reconnaissance and Physical Characterization, Igiugig, AK". United States. https://dx.doi.org/10.15473/1418354. https://mhkdr.openei.org/submissions/82.
@div{oedi_3918, title = {Kvichak River RISEC Project Resource Reconnaissance and Physical Characterization, Igiugig, AK}, author = {McEntee, Jarlath.}, abstractNote = {During the summer and fall of 2011 TerraSond Ltd. (TerraSond) completed a bathymetric survey and hydrokinetic energy assessment of the Kvichak River at Igiugig, Alaska. The purpose of this work was to characterize the initial site conditions for the design and installation of a hydrokinetic turbine to provide electric power for the village. There were six distinct phases of work for this project. The first was a literature review and investigation of prior surveys and hydrologic studies done in the area. The second, third, fourth, and fifth phases consisted of four field expeditions conducted over the summer and fall of 2011. These expeditions consisted of an initial reconnaissance, multi beam bathymetric surveys, flow velocity and discharge measurements, a survey of water levels, and detailed flow velocity studies. The final phase of the project was complete data reduction, and preparation of the final report with its accompanying map sheets and data packages.
This submission contains the final report for the Kvichak River RISEC Project in addition to weather data for Igiugig, AK, Summer 2015.}, doi = {10.15473/1418354}, url = {https://mhkdr.openei.org/submissions/82}, journal = {}, number = , volume = , place = {United States}, year = {2015}, month = {10}}
https://dx.doi.org/10.15473/1418354
Details
Data from Oct 1, 2015
Last updated Jul 30, 2020
Submitted Mar 21, 2016
Organization
Ocean Renewable Power Company
Contact
Jarlath McEntee
207.610.4318
Authors
Original Source
https://mhkdr.openei.org/submissions/82Research Areas
Keywords
MHK, Marine, Hydrokinetic, energy, power, bathymetry, riverine, flow measurements, flow study, alaska, AK, Kvichak River, resource, river, Igiugig, bathymetric, survey, assessment, characterization, site, reconnaissance, surface water, hydrology, depth, in-stream, energy conversion, RISEC, orpc, current, flow, weather, TerraSond, geospatial data, velocity, water level, acoustic doppler current profiler, ADCP, field data, energy density, slope, moving bed test, hydrographic, data, multibeamDOE Project Details
Project Name ADVANCED ENERGY HARVESTING CONTROL SCHEMES FOR MARINE RENEWABLE ENERGY DEVICES
Project Lead Alison LaBonte
Project Number EE0006397