Search OEDI Data
Showing results 1 - 4 of 4.
Show
results per page.
Order by:
Available Now:
Research Areas
Accessibility
Data Type
Organization
Source
TEAMER: Technical Support for Aquantis (Materials): CRD-21-17762-0
The Aquantis Tidal Power Tug is a unique synthesis of best-available technologies and materials configured as a novel spar vessel to create an optimal platform for tidal stream energy conversion. The Power Tug utilizes an upstream-facing horizontal, 2-bladed rotor. To drive down c...
Swales, H. et al Aquantis, Inc.
Oct 17, 2024
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Public Reference Data for Megawatt-Scale Hydrogen Electrolysis Simulated Marine Hydrokinetic Tidal Turbine
The U.S. Department of Energy and National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis, hydrogen compression and storage, and variable hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced Resea...
Abel, R. et al National Laboratory of the Rockies
May 19, 2026
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Public Reference Data for Megawatt-Scale Hydrogen Electrolysis – Simulated Wave
The U.S. Department of Energy and the National Laboratory of the Rockies (NLR) demonstrate hydrogen electrolysis, hydrogen compression and storage, and variable hydrogen fuel cell power production using megawatt-scale equipment at NLR’s Flatirons Campus as part of the Advanced R...
Abel, R. et al National Laboratory of the Rockies
Dec 12, 2025
11 Resources
0 Stars
Publicly accessible
11 Resources
0 Stars
Publicly accessible
UNH TDP Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary
This data was collected between October 12 and December 15 of 2021 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). This data set includes over 29 days of grid connected turbine operation during this 65 day time f...
Wosnik, M. et al National Renewable Energy Laboratory
Dec 21, 2021
30 Resources
0 Stars
Publicly accessible
30 Resources
0 Stars
Publicly accessible