Search OEDI Data
Showing results 1 - 2 of 2.
Show
results per page.
Order by:
Available Now:
Research Areas
Accessibility
Data Type
Organization
Source
LCOE Baseline for OE Buoy WEC Device
Capex numbers are in $/kW, Opex numbers in $/kW-yr. Cost Estimates provided herein are based on concept design and basic engineering data and have high levels of uncertainties embedded. This reference economic scenario was done for a very large device version of the Ocean Energy ...
Previsic, M. et al Re Vision Consulting
Jul 26, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Techno-Economic Assessment of AWS Waveswing
The submitted information includes the final report and the supporting datasets in Excel format.
Submitted data includes:
an Excel based techno-economic model with input-output (IO) analysis, costing functions in generalized form, performance metrics and computation, and scatte...
Previsic, M. Re Vision Consulting
Mar 07, 2025
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible