LCOE Baseline for OE Buoy WEC Device
Capex numbers are in $/kW, Opex numbers in $/kW-yr. Cost Estimates provided herein are based on concept design and basic engineering data and have high levels of uncertainties embedded. This reference economic scenario was done for a very large device version of the Ocean Energy ...
Previsic, M. et al Re Vision Consulting
Jul 26, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
LCOE Content Model for the Heaving Point Absorber Buoy
This is the LCOE analysis spreadsheet and content model for the heaving point absorber buoy developed for controls purposes. The cost assessment was done on a wave-farm of 100-units.
Previsic, M. and Karthikeyan, A. Re Vision Consulting
Jul 14, 2017
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible