Search OEDI Data
Showing results 1 - 5 of 5.
Show
results per page.
Order by:
Available Now:
Research Areas
Accessibility
Data Type
Organization
Source
ADCP Acoustic Interference Survey Data, Sequim Bay Inlet, WA
Raw ADCP (Acoustic Doppler Current Profiler) datasets from acoustic interference surveys with a TRDI Workhorse 300, a Nortek Signature500 and two Signature1000 instruments from August 2020. One Signature 1000 ADCP was deployed for 13 days on a bottom lander in Sequim Bay Inlet, WA...
McVey, J. and Cavagnaro, R. Pacific Northwest National Laboratory
Aug 13, 2020
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
ARIS Acoustic Camera Data Around a 5kW In-River Turbine from Tanana River Test Site
Four days (June 14-17, 2021) of ARIS acoustic camera data from the main research barge of the Tanana River Test Site operated by UAF. Data are collected sidelooking with the turbine in part of the field of view. This data was collected as part of a fish collision risk study. An ac...
Staines, G. Pacific Northwest National Laboratory
Jun 14, 2021
19 Resources
0 Stars
Publicly accessible
19 Resources
0 Stars
Publicly accessible
Triton Field Trials (TFiT) underwater noise University of New Hampshire Living Bridge turbine Processed Data
In July 2021, a commercial-off-the-shelf hydrophone was deployed in a free-drifting configuration to measure underwater acoustic emissions and characterize a 25 kW-rated tidal turbine at the University of New Hampshire's Living Bridge Project in Portsmouth, New Hampshire. Sampling...
Haxel, J. et al Pacific Northwest National Laboratory
Jul 21, 2021
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
Reservoir Stimulation Optimization with Operational Monitoring for Creation of EGS
EGS field projects have not sustained production at rates greater than 1/2 of what is needed for economic viability. The primary limitation that makes commercial EGS infeasible is our current inability to cost-effectively create high-permeability reservoirs from impermeable, igneo...
A., C. Pacific Northwest National Laboratory
Sep 15, 2014
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Reservoir Stimulation Optimization with Operational Monitoring for Creation of EGS
EGS field projects have not sustained production at rates greater than half of what is needed for economic viability. The primary limitation that makes commercial EGS infeasible is our current inability to cost-effectively create high-permeability reservoirs from impermeable, igne...
A., C. Pacific Northwest National Laboratory
Sep 25, 2013
19 Resources
0 Stars
Publicly accessible
19 Resources
0 Stars
Publicly accessible