Search OEDI Data
Showing results 326 - 350 of 373.
Show
results per page.
Order by:
Available Now:
Research Areas
Accessibility
Data Type
Organization
Source
Triton-C Point Absorber Preliminary System Design Package
Preliminary System Design Package for the Triton-C WEC, including a report and CAD drawings pertaining to the overall preliminary design, system arrangement, surface float hull, and surface float arrangement.
Mundon, T. Oscilla Power, Inc.
Dec 01, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
NWEI Azura June 2018 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Jul 31, 2018
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/50th Testing M3 Wave Submerged Mid-Column Pressure Differential WEC
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the M3 Wave team, and includes:
1/50th test data (raw & processed)
1/50th test data video and pictures
1/50th Test plans and testing documents
SSTF_Submission (summarized ...
Scharmen, W. Ricardo Detroit Technical Center
Jan 08, 2016
10 Resources
0 Stars
Publicly accessible
10 Resources
0 Stars
Publicly accessible
NWEI Azura May 2018 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navys Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing spe...
Lettenmaier, T. Northwest Energy Innovations
Jul 23, 2018
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
NWEI Azura November 2015 Data
Data files for the NWEI Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, HI. See general documentation describing sp...
Lettenmaier, T. Northwest Energy Innovations
Dec 15, 2015
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
CODAS Data from Oliktok Point, Beaufort Sea, Alaska
Cryosphere/Ocean Distributed Acoustic Sensing (CODAS) data collected from the Beaufort Sea, Alaska, using ~37.4 km of dark telecommunications fiber located at Oliktok Point, Alaska. Data were collected with a Silixa iDAS, using 10 m gauge length, 2 m spatial resolution, and 1000 H...
Baker, M. and Abbott, R. Sandia National Laboratories
Aug 08, 2023
23 Resources
0 Stars
Publicly accessible
23 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/20th Testing M3 Wave Submerged Mid-Column Pressure Differential
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the M3 Wave team, including the 1/20th scale test plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obtain the necessary me...
Scharmen, W. Ricardo Detroit Technical Center
Aug 12, 2016
26 Resources
0 Stars
Publicly accessible
26 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/20th Testing Harvest Wave Energy Oscillating Wave Surge Converter
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the Harvest Wave Energy team, including the 1/20th scale test plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obtain the ...
Scharmen, W. Ricardo Detroit Technical Center
Aug 26, 2016
34 Resources
0 Stars
Publicly accessible
34 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/50th Testing Principle Power Oscillating Water Column
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Principle Power team, and includes:
1/50th test data (raw & processed)
1/50th test data video and pictures
1/50th Test plans and testing documents
SSTF_Submission (sum...
Scharmen, W. Ricardo Detroit Technical Center
Jan 08, 2016
12 Resources
0 Stars
Publicly accessible
12 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC Wave Tank Testing Final Raw Dataset
Complete dataset from wave tank testing for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX". Subdirectories include Readme files where appropriate to aid in navigation.
Morrow, M. et al M3 Wave
Sep 01, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
StingRAY WEC Risk Register
Risk Registers for major subsystems of the StingRAY WEC completed in compliance with the DOE Risk Management Framework developed by NREL.
Rhinefrank, K. Columbia Power Technologies, Inc.
Feb 24, 2017
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/50th Testing Float Inc. BergerABAM Rho-Cee Hybrid WEC
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for Float Inc. During the testing of its 1/50th-scale device, Float Inc. Berger ABAM was deemed ineligible due to the fact that they brought a device with them to test and did no...
Scharmen, W. Ricardo Detroit Technical Center
Jan 15, 2016
13 Resources
0 Stars
Publicly accessible
13 Resources
0 Stars
Publicly accessible
NREL MOIS Data for NWEI Azura May 2016
NREL Modular Ocean Instrumentation System (MOIS) data files for the Azura grid-connected deployment at the 30-meter berth of the US Navy's Wave Energy Test Site (WETS 30m Site) at the Kaneohe Marine Corps Base Hawaii (MCBH) on the windward (northeast) coast of the island of Oahu, ...
Nelson, E. National Renewable Energy Laboratory
Jun 07, 2016
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Admiralty Inlet Advanced Turbulence Measurements: Final Data and Code Archive
Data and code that is not already in a public location that is used in Kilcher, Thomson, Harding, and Nylund (2017) "Turbulence Measurements from Compliant Moorings Part II: Motion Correction" doi: 10.1175/JTECH-D-16-0213.1.
The links point to Python source code used in the publi...
Kilcher, L. et al National Renewable Energy Laboratory
Feb 01, 2011
11 Resources
0 Stars
Publicly accessible
11 Resources
0 Stars
Publicly accessible
LandRAY PTO Testing Utilizing the NREL NWTC 5MW Dynamometer
The overarching project objective is to demonstrate the feasibility of using an innovative PowerTake-Off (PTO) Module in Columbia Power's utility-scale wave energy converter (WEC). The PTO Module uniquely combines a large-diameter, direct-drive, rotary permanent magnet generator; ...
Lenee-Bluhm, P. and Rhinefrank, K. Columbia Power Technologies, Inc.
Jun 13, 2016
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Risk Management Plan and Risk Register for Design Low-Power Wave Energy Converter for Non-Grid Applications
Risk Registers for major subsystems completed according to the methodology described in the Risk Management Plan [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf], also included here.
Amon, E. Columbia Power Technologies, Inc.
Jul 19, 2019
17 Resources
0 Stars
Publicly accessible
17 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/20th Testing Oscilla Power Triton Point Absorber
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the Oscilla Power team, including the 1/20th Test Plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obtain the necessary me...
Scharmen, W. Ricardo Detroit Technical Center
Sep 16, 2016
40 Resources
0 Stars
Publicly accessible
40 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/20th Testing Waveswing America Submerged Pressure Differential WEC
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the Waveswing America team, including the 1/20th scale test plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obtain the ne...
Scharmen, W. Ricardo Detroit Technical Center
Aug 19, 2016
43 Resources
0 Stars
Publicly accessible
43 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/20th Testing CalWave Submerged Pressure Differential WEC
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the CalWave Power Technologies team, including the 1/20th scale test plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obta...
Scharmen, W. Ricardo Detroit Technical Center
Sep 09, 2016
38 Resources
0 Stars
Publicly accessible
38 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/20th Testing Sea Potential DUO Point Absorber
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the Sea Potential team, including the 1/20th scale test plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obtain the necess...
Scharmen, W. Ricardo Detroit Technical Center
Sep 23, 2016
48 Resources
0 Stars
Publicly accessible
48 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC Downselection Report
This downselect report follows the progression from initial concept pool to final concepts moving forward to tank testing for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX." Included is a brief discussion of anticipated impacts of the 3 final...
Morrow, M. and Delos-Reyes, M. M3 Wave
Aug 01, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Northwest National Marine Renewable Energy Center, OR Project Plans
Plans for Northwest National Marine Renewable Energy Center (NNMREC) Project.
Mobile Ocean Test Berth (MOTB) plans
PMEC-SETS Plans
Hellin, D. Northwest National Marine Renewable Energy Center
Jun 29, 2016
20 Resources
0 Stars
Publicly accessible
20 Resources
0 Stars
Publicly accessible
TidGen LCOE Workbooks
Workbooks showing Annualized Energy Production, Cost Breakdown Structure, Levelized Cost of Electricity for DOE Reference Tidal Project
1) Baseline TidGen Power System
2) TidGen Power System with the application of Advanced Controls
3) Advanced TidGen Power System with several enh...
McEntee, J. Ocean Renewable Power Company
Mar 21, 2016
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/20th Testing AquaHarmonics Point Absorber
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the AquaHarmonics team, including the 1/20th scale test plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obtain the necess...
Scharmen, W. Ricardo Detroit Technical Center
Sep 02, 2016
69 Resources
0 Stars
Publicly accessible
69 Resources
0 Stars
Publicly accessible
Current Energy Harnessing using Synergistic Kinematics of Schools of Fish-Shaped Bodies: Marine Hydrodynamics Laboratory Tank Testing Data
The objectives of the proposed work pertain to building a high power-density and high efficiency device to harness MHK energy by mimicking fish-school kinematics. Vortex Hydro Energy is collaborating with a concept formed and undergone preliminary testing at the University of Mich...
Bernitsas, M. Vortex Hydro Energy
Apr 11, 2017
20 Resources
0 Stars
Publicly accessible
20 Resources
0 Stars
Publicly accessible