Search OEDI Data
Showing results 326 - 350 of 361.
Show
results per page.
Order by:
Available Now:
Research Areas
Accessibility
Data Type
Organization
Source
Wave Energy Prize 1/50th Testing Super Watt Wave Catcher Barge Attenuator
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Super Watt Wave Catcher Barge team, and includes:
1/50th test data (raw & processed)
1/50th test data video and pictures
1/50th Test plans and testing documents
SSTF_S...
Scharmen, W. Ricardo Detroit Technical Center
Dec 04, 2015
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/50th Testing SEWEC Attenuator
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the SEWEC team, and includes:
1/50th test data (raw & processed)
1/50th test data video and pictures
1/50th Test plans and testing documents
SSTF_Submission (summarized re...
Scharmen, W. Ricardo Detroit Technical Center
Dec 11, 2015
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/50th Testing Waveswing America Submerged Pressure Differential WEC
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Waveswing America team, and includes:
1/50th test data (raw & processed)
1/50th test data video and pictures
1/50th Test plans and testing documents
Results
Scharmen, W. Ricardo Detroit Technical Center
Jan 22, 2016
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/50th Testing Advanced Ocean Energy @ VT Bundled Pipe Terminator WEC
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the for the Advanced Ocean Energy @VT team, and includes:
1/50th test data (raw & processed)
1/50th test data video and pictures
1/50th Test plans and testing documents
SS...
Scharmen, W. Ricardo Detroit Technical Center
Jan 29, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/50th Testing Sea Potential DUO Point Absorber
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Sea Potential team, and includes:
1/50th test data (raw & processed)
1/50th test data video and pictures
1/50th Test plans and testing documents
SSTF_Submission (summa...
Scharmen, W. Ricardo Detroit Technical Center
Dec 04, 2015
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/50th Testing Team Flapper/Harvest Oscillating Wave Surge Converter
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Team Flapper/Harvest, and includes:
1/50th test data (raw & processed)
1/50th test data video and pictures
1/50th Test plans and testing documents
SSTF_Submission (sum...
Scharmen, W. Ricardo Detroit Technical Center
Dec 18, 2015
8 Resources
0 Stars
Publicly accessible
8 Resources
0 Stars
Publicly accessible
Advanced Direct-Drive Generator for Improved Availability of Oscillating Wave Surge Converter Power Generation Systems: 10hp 30rpm Radial-Flux Magnetically Geared Generator Test Data
Static torque, no load, constant speed, and sinusoidal oscillation test data for a 10hp, 300rpm magnetically-geared generator prototype using either an adjustable load bank for a fixed resistance or an output power converter.
Ouyang, W. and Tchida, C. ABB Inc.
May 02, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Advanced Direct-Drive Generator for Improved Availability of Oscillating Wave Surge Converter Power Generation Systems: 1hp 300rpm Axial-Flux Magnetically Geared Generator Test Data
Static torque and no load test data for a 1hp, 300rpm axial-flux magnetically geared generator prototype developed by Texas A&M EMPE Lab.
Toliyat, H. et al ABB Inc.
May 02, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/50th Testing AquaHarmonics Point Absorber
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the AquaHarmonics team, and includes:
1/50th test data (raw & processed)
1/50th test data video and pictures
1/50th Test plans and testing documents
SSTF_Submission (summa...
Scharmen, W. Ricardo Detroit Technical Center
Jan 15, 2016
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
Triton-C Point Absorber Preliminary System Design Package
Preliminary System Design Package for the Triton-C WEC, including a report and CAD drawings pertaining to the overall preliminary design, system arrangement, surface float hull, and surface float arrangement.
Mundon, T. Oscilla Power, Inc.
Dec 01, 2017
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
TriFrame Mount Structural Performance Period A
Long-Term TriFrame Monitoring System (LTTFMS) data collected during Period A (13 days 10/22/20 11/4/20). The central component of the Verdant Power Free Flow System is a three-bladed horizontal-axis turbine. The turbine is equipped with a composite rotor with three fixed-pitch bl...
Colby, J. et al Verdant Power Inc.
Nov 12, 2021
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/50th Testing M3 Wave Submerged Mid-Column Pressure Differential WEC
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the M3 Wave team, and includes:
1/50th test data (raw & processed)
1/50th test data video and pictures
1/50th Test plans and testing documents
SSTF_Submission (summarized ...
Scharmen, W. Ricardo Detroit Technical Center
Jan 08, 2016
10 Resources
0 Stars
Publicly accessible
10 Resources
0 Stars
Publicly accessible
Wettability-Effect-Complex-Conductivity-Permittivity
Misra, S. National Renewable Energy Laboratory
Sep 22, 2019
3 Resources
0 Stars
In curation
3 Resources
0 Stars
In curation
Northwest National Marine Renewable Energy Center, OR Project Plans
Plans for Northwest National Marine Renewable Energy Center (NNMREC) Project.
Mobile Ocean Test Berth (MOTB) plans
PMEC-SETS Plans
Hellin, D. Northwest National Marine Renewable Energy Center
Jun 29, 2016
20 Resources
0 Stars
Publicly accessible
20 Resources
0 Stars
Publicly accessible
HydroAir Power Take Off Combined Design Report
The submission is the combined design report for the HydroAir Power Take Off (PTO). CAD drawings, circuit diagrams, design report, test plan, technical specifications and data sheets are included for the Main and auxiliary control cabinets and three-phase-synchronous-motor with a ...
Pearson, G. et al Dresser-Rand Company
Jun 26, 2015
15 Resources
0 Stars
Publicly accessible
15 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System System Fabrication Plan
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
ALFA Biological Monitoring NNMREC South Energy Test Site, Offshore of Newport, OR
Acoustic Pilot surface survey at the South Energy Test Center at Newport (Oregon). Data collected with a SIMRAD EK-60 echosounder using four frequencies (38, 70, 120 and 200 kHz).
Horne, J. Northwest National Marine Renewable Energy Center
Oct 08, 2015
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Aquantis 2.5 MW Ocean Current Generation Device Full Scale Mooring Analysis Report and Specifications
This dataset contains the Aquantis 2.5 MW Ocean Current Generation Device full scale mooring analysis report and specifications.
Arthurs, D. Dehlsen Associates, LLC
Jun 03, 2015
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Final Technical Report
Final Technical Report for "Advanced Controls for the Multi-pod Centipod WEC device" describing project parameters, organization, task activities, accomplishments, and conclusions. See other submissions under this DOE project for economic viability, design geometry, and modeling.
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Pacific Marine Energy Center, OR South Energy Test Site, Wave Measurements
TRIAXYS data from the NNMREC-SETS, for Nov. 2014 Jan. 2015, and May 2015 Dec. 2015. The data consists of: Date, Time, significant wave height (1 hour average), significant wave period (1 hour average).
Von, A. Northwest National Marine Renewable Energy Center
Jun 06, 2016
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/50th Testing Principle Power Oscillating Water Column
This submission of data includes all the 1/50th scale testing data completed on the Wave Energy Prize for the Principle Power team, and includes:
1/50th test data (raw & processed)
1/50th test data video and pictures
1/50th Test plans and testing documents
SSTF_Submission (sum...
Scharmen, W. Ricardo Detroit Technical Center
Jan 08, 2016
12 Resources
0 Stars
Publicly accessible
12 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Material Set Selection
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/20th Testing SEWEC Attenuator
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the SEWEC team, including the 1/20th scale test plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obtain the necessary meas...
Scharmen, W. Ricardo Detroit Technical Center
Oct 07, 2016
33 Resources
0 Stars
Publicly accessible
33 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System Development Test Plan
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/20th Testing M3 Wave Submerged Mid-Column Pressure Differential
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the M3 Wave team, including the 1/20th scale test plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obtain the necessary me...
Scharmen, W. Ricardo Detroit Technical Center
Aug 12, 2016
26 Resources
0 Stars
Publicly accessible
26 Resources
0 Stars
Publicly accessible