Search OEDI Data
Showing results 226 - 250 of 304.
Show
results per page.
Order by:
Available Now:
Research Areas
Accessibility
Data Type
Organization
Source
Pacific Marine Energy Center, OR South Energy Test Site, Wave Measurements
TRIAXYS data from the NNMREC-SETS, for Nov. 2014 Jan. 2015, and May 2015 Dec. 2015. The data consists of: Date, Time, significant wave height (1 hour average), significant wave period (1 hour average).
Von, A. Northwest National Marine Renewable Energy Center
Jun 06, 2016
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Modeling the Integration of Marine Energy into Microgrids Wave Resource Assessment
This submission has wave resource assessments which were conducted for six locations based on IEC requirements using the DOE WPTO Hindcast data and MHKiT. The locations are chosen to provide varying wave climates and include PacWave South, OR; Wave Energy Testing Site (WETS), HI; ...
Mankle, H. and Robertson, B. University of Alaska Fairbanks
Jan 19, 2023
9 Resources
0 Stars
Publicly accessible
9 Resources
0 Stars
Publicly accessible
Advanced TidGen Power System LCOE Calculations and System Overview
The TidGen Power System generates emission-free electricity from tidal currents and connects directly into existing grids using smart grid technology. The power system consists of three major subsystems: shore-side power electronics, mooring system, and turbine generator unit (TGU...
Marnagh, C. and McEntee, J. Ocean Renewable Power Company
Jun 14, 2018
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Turbine Depth Optimization Study, Admiralty Inlet, WA
The zipped file contains a directory of data and routines used in the NNMREC turbine depth optimization study (Kawase et al., 2011), and calculation results thereof. For further info, please contact Mitsuhiro Kawase at kawase@uw.edu.
Kawase, M. et al University of Washington
Nov 22, 2009
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Next Generation RivGen Power System: Feasibility Assessment of Hydroacoutics Data for Development of a Probability of Encounter Model of Salmon Smolts
This document contains a feasibility assessment for salmon smolt characterization and analysis based on existing hydroacoustics data and probability of encounter model.
Daroux, A. and Zydlewski, G. Igiugig Village Council
Oct 04, 2017
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
LCOE Baseline for Wave Carpet WEC Device
This is an LCOE (levelized cost of energy) baseline assessment for the Wave Carpet.
Previsic, M. et al Re Vision Consulting
Jul 26, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
M3 Wave DMP/APEX WEC Wave Tank Testing Final Raw Dataset
Complete dataset from wave tank testing for the Delos-Reyes Morrow Pressure Device (DMP), commercialized by M3 Wave LLC as "APEX". Subdirectories include Readme files where appropriate to aid in navigation.
Morrow, M. et al M3 Wave
Sep 01, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
LCOE and Baseline Data for ORPC's RivGen 1.F River Power System
Base data and documentation of LCOE calculations for ORPC's RivGen 1.F Power System, demonstrated in the Kvichak River at Igiugig, Alaska in 2015.
Salmon, A. Igiugig Village Council
Oct 31, 2016
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
Aquantis 2.5 MW Ocean Current Generation Device Design Details
Items in this submission provide the detailed design of the Aquantis Ocean Current Turbine and accompanying analysis documents, including preliminary designs, verification of design reports, CAD drawings of the hydrostatic drivetrain, a test plan and an operating conditions simula...
Banko, R. et al Dehlsen Associates, LLC
Jun 03, 2015
22 Resources
0 Stars
Publicly accessible
22 Resources
0 Stars
Publicly accessible
MASK2B Initial Results from Wave Tank Test of Closed-Loop WEC Control
This dataset covers the MASK2B wave tank experiment focused on a more complete study of one degree of freedom (1DOF) control of the WEC was considered, including maximization of electrical power, multi-objective performance mapping, and implementation of a novel predictionless con...
Coe, R. et al Sandia National Laboratories
May 25, 2018
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Simulink Model of a New Energy EVG-005 5kW Hydropower Turbine
Simulink model for a New Energy 5kW hydropower turbine.
ADCP data ("ds_streamwise_7_13.nc") and DC voltage, DC current, and rotor rotation observed from the New Energy EVG-005 Current Energy Converter (CEC) ("electrical_7_13_10ohms.nc") were collected at the Tanana River Test Sit...
Browning, E. et al University of Alaska Fairbanks
Jul 13, 2023
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
TEAMER: Experimental performance characterization of a shrouded axial-flow turbine
Sitkana has developed a shrouded hydrokinetic turbine with a modular, low-cost design that can be scaled to meet the needs of remote communities. With technical support from the University of Washington, Sitkana sought to experimentally characterize the mechanical power and struct...
McMullan, L. et al University of Washington
Oct 20, 2023
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Acoustic Doppler Velocimeter (ADV) data from the University of New Hampshire Atlantic Marine Energy Center (UNH-AMEC ) Tidal Energy Test Site during a Perigean Spring Tide
The ADV measurements contained in this submission were taken on the floating turbine deployment platform (TDP) located at the Memorial Bridge in Portsmouth, NH. The measurements were conducted 11/4/2021-11/9/2021 with the fastest currents occurring on 11/7/2021. Along with the sub...
Bichanich, M. and Wosnik, M. University of New Hampshire, Atlantic Marine Energy Center (AMEC)
Nov 09, 2021
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
TriFrame Mount Structural Performance Period A
Long-Term TriFrame Monitoring System (LTTFMS) data collected during Period A (13 days 10/22/20 11/4/20). The central component of the Verdant Power Free Flow System is a three-bladed horizontal-axis turbine. The turbine is equipped with a composite rotor with three fixed-pitch bl...
Colby, J. et al Verdant Power Inc.
Nov 12, 2021
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Aquantis 2.5 MW Ocean Current Generation Device Tow Tank Dynamic Test Rig Drawings and Bill of Materials
Aquantis 2.5 MW Ocean Current Generation Device, Tow Tank Dynamic Test Rig Drawings and Bill of Materials. This submission contains information on the equipment for the scaled model tow tank testing. The information includes hardware, test protocols, and plans.
Swales, H. et al Dehlsen Associates, LLC
Jun 03, 2015
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/20th Testing RTI Wave Power Oscillating Wave Surge Converter
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the RTI Wave Power team, including the 1/20th Test Plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obtain the necessary m...
Scharmen, W. Ricardo Detroit Technical Center
Sep 30, 2016
40 Resources
0 Stars
Publicly accessible
40 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/20th Testing SEWEC Attenuator
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the SEWEC team, including the 1/20th scale test plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obtain the necessary meas...
Scharmen, W. Ricardo Detroit Technical Center
Oct 07, 2016
33 Resources
0 Stars
Publicly accessible
33 Resources
0 Stars
Publicly accessible
MASK4 Test Campaign for Sandia WaveBot Device Dataset
This data and report details the findings from a wave tank test focused on production of useful work of a wave energy converter (WEC) device. The experimental system and test were specifically designed to validate models for power transmission throughout the WEC system. Additional...
Forbush, D. et al Sandia National Laboratories
Dec 25, 2023
5 Resources
0 Stars
Publicly accessible
5 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Baseline LCOE
Project baseline levelized cost of energy (LCOE) model for the Centipod WEC containing annual energy production (AEP) data, a cost breakdown structure (CBS), model documentation, and the LCOE content model. This baseline was built for comparison with the resultant LCOE model, buil...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Centipod WEC, Advanced Controls, Resultant LCOE
Project resultant levelized cost of energy (LCOE) model after implementation of model predictive control (MPC) controller. Contains annual energy production (AEP) data, cost breakdown structure (CBS), model documentation, and the LCOE content model. This is meant for comparison wi...
McCall, A. Dehlsen Associates, LLC
Feb 15, 2016
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
Focusing Wave Energy for Wave Energy Converter Applications
Wave tank tests at Stevens Institute of Technology quantified the ability of near-surface platforms to concentrate wave energy over the platform.
Due to the instantaneous change in water depth, mass, energy, and power are conserved in this process. The energy and power concentrat...
Raftery, M. Martin and Ottaway
Aug 10, 2010
7 Resources
0 Stars
Publicly accessible
7 Resources
0 Stars
Publicly accessible
UMass 2-Body WEC Techno-Economic Assessment
The University of Massachusetts (UMass) is developing a 2-body wave energy converter (WEC) device that is converting mechanical power into electricity using a mechanical motion rectifier that allows the system to couple to a flywheel. UMass has completed numerical modeling, wave t...
Previsic, M. Re Vision Consulting
Nov 19, 2024
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
LCOE Baseline for OE Buoy WEC Device
Capex numbers are in $/kW, Opex numbers in $/kW-yr. Cost Estimates provided herein are based on concept design and basic engineering data and have high levels of uncertainties embedded. This reference economic scenario was done for a very large device version of the Ocean Energy ...
Previsic, M. et al Re Vision Consulting
Jul 26, 2017
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/20th Testing M3 Wave Submerged Mid-Column Pressure Differential
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the M3 Wave team, including the 1/20th scale test plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obtain the necessary me...
Scharmen, W. Ricardo Detroit Technical Center
Aug 12, 2016
26 Resources
0 Stars
Publicly accessible
26 Resources
0 Stars
Publicly accessible
CODAS Data from Oliktok Point, Beaufort Sea, Alaska
Cryosphere/Ocean Distributed Acoustic Sensing (CODAS) data collected from the Beaufort Sea, Alaska, using ~37.4 km of dark telecommunications fiber located at Oliktok Point, Alaska. Data were collected with a Silixa iDAS, using 10 m gauge length, 2 m spatial resolution, and 1000 H...
Baker, M. and Abbott, R. Sandia National Laboratories
Aug 08, 2023
23 Resources
0 Stars
Publicly accessible
23 Resources
0 Stars
Publicly accessible