Search OEDI Data
Showing results 1 - 5 of 5.
Show
results per page.
Order by:
Available Now:
Research Areas
Accessibility
Data Type
Organization
Source
Aquantis 2.5 MW Ocean Current Generation Device Scaled Tank Test Design and Results
Aquantis 2.5 MW Ocean Current Generation Device, Tow Tank Dynamic Rig Structural Analysis Results. This is the detailed documentation for scaled device testing in a tow tank, including models, drawings, presentations, cost of energy analysis, and structural analysis. This datase...
Swales, H. et al Dehlsen Associates, LLC
Jun 03, 2015
46 Resources
0 Stars
Publicly accessible
46 Resources
0 Stars
Publicly accessible
Aquantis 2.5 MW Ocean Current Generation Device Design Details
Items in this submission provide the detailed design of the Aquantis Ocean Current Turbine and accompanying analysis documents, including preliminary designs, verification of design reports, CAD drawings of the hydrostatic drivetrain, a test plan and an operating conditions simula...
Banko, R. et al Dehlsen Associates, LLC
Jun 03, 2015
22 Resources
0 Stars
Publicly accessible
22 Resources
0 Stars
Publicly accessible
Devices Suitable for Sectional Isolation Along Both Cased and Open-hole Wellbores Geomechanical Packer Formation Model Iteraction
The main goal of this project is to develop an annular isolation system capable to withstand geothermal downhole conditions and mitigate the problems experienced by conventional packers in FORGE wells. This presentation outlines the work in rock modelling and interaction with the ...
Ghassemi, A. et al Welltec
Jun 20, 2023
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Aquantis 2.5 MW Ocean Current Generation Device Tow Tank Dynamic Test Rig Drawings and Bill of Materials
Aquantis 2.5 MW Ocean Current Generation Device, Tow Tank Dynamic Test Rig Drawings and Bill of Materials. This submission contains information on the equipment for the scaled model tow tank testing. The information includes hardware, test protocols, and plans.
Swales, H. et al Dehlsen Associates, LLC
Jun 03, 2015
18 Resources
0 Stars
Publicly accessible
18 Resources
0 Stars
Publicly accessible
Reservoir Stimulation Optimization with Operational Monitoring for Creation of EGS
EGS field projects have not sustained production at rates greater than half of what is needed for economic viability. The primary limitation that makes commercial EGS infeasible is our current inability to cost-effectively create high-permeability reservoirs from impermeable, igne...
A., C. Pacific Northwest National Laboratory
Sep 25, 2013
19 Resources
0 Stars
Publicly accessible
19 Resources
0 Stars
Publicly accessible