Search OEDI Data
Showing results 1 - 2 of 2.
Show
results per page.
Order by:
Available Now:
Research Areas
Accessibility
Data Type
Organization
Source
Testing for Controlled Rapid Pressurization
Borehole W1 is a NQ core hole drilled at our test site in Socorro. The rock is rhyolite. Borehole W1 which was used to test gas-gas explosive mixtures is 55 feet deep with casing (pinkish in the drawing) set to 35 feet. The model is a representation of the borehole and the hol...
Knudsen, S. Sandia National Laboratories
Sep 03, 2014
1 Resources
0 Stars
Publicly accessible
1 Resources
0 Stars
Publicly accessible
Newberry EGS Demonstration: Well 55-29 Stimulation Data 2014
The Newberry Volcano EGS Demonstration in central Oregon, a 5 year project begun in 2010, tests recent technological advances designed to reduce the cost of power generated by EGS in a hot, dry well (NWG 55-29) drilled in 2008. First, the stimulation pumps used were designed to ru...
Cladhouhos, T. et al AltaRock Energy Inc
Sep 03, 2015
54 Resources
0 Stars
Publicly accessible
54 Resources
0 Stars
Publicly accessible