Search OEDI Data
Showing results 1 - 5 of 5.
Show
results per page.
Order by:
Available Now:
Research Areas
Accessibility
Data Type
Organization
Source
TEAMER: Electrically Engaged Undulation System for Unmanned Underwater Vehicles
This TEAMER RFTS 1 (Request for Technical Support) project supported the flume tank testing of a long range, high endurance unmanned underwater vehicle (UUV) to monitor maritime space. Today, battery-powered remotely operated vehicles (ROVs) lack the duration to make persistent, w...
Lu, K. and Datla, R. Pyro-E
Oct 01, 2021
4 Resources
0 Stars
Publicly accessible
4 Resources
0 Stars
Publicly accessible
End Use Load Profile (EULP) of US Building Sector resulting from mass GHP retrofits
This collection of datasets describes the change (difference) in hourly energy consumption of the U.S. residential and commercial building stock while replacing existing HVAC systems with ground source heat pumps for all the balancing areas in the US, for all buildings eligible fo...
Liu, X. et al Oak Ridge National Laboratory
Apr 15, 2023
2 Resources
0 Stars
Publicly accessible
2 Resources
0 Stars
Publicly accessible
Utah FORGE: Optimization of a Plug-and-Perf Stimulation (Fervo Energy)
Information around the plug-and-perf treatment design at Utah FORGE by Fervo Energy.
Objective and Purpose:
Develop a multistage hydraulic stimulation approach designed specifically to target the top three factors that control the technical and commercial viability of an EGS sys...
Norbeck, J. et al Fervo Energy
Feb 08, 2023
3 Resources
0 Stars
Publicly accessible
3 Resources
0 Stars
Publicly accessible
Triton Field Trials (TFiT) underwater noise University of New Hampshire Living Bridge turbine Processed Data
In July 2021, a commercial-off-the-shelf hydrophone was deployed in a free-drifting configuration to measure underwater acoustic emissions and characterize a 25 kW-rated tidal turbine at the University of New Hampshire's Living Bridge Project in Portsmouth, New Hampshire. Sampling...
Haxel, J. et al Pacific Northwest National Laboratory
Jul 21, 2021
6 Resources
0 Stars
Publicly accessible
6 Resources
0 Stars
Publicly accessible
Reservoir Stimulation Optimization with Operational Monitoring for Creation of EGS
EGS field projects have not sustained production at rates greater than half of what is needed for economic viability. The primary limitation that makes commercial EGS infeasible is our current inability to cost-effectively create high-permeability reservoirs from impermeable, igne...
A., C. Pacific Northwest National Laboratory
Sep 25, 2013
19 Resources
0 Stars
Publicly accessible
19 Resources
0 Stars
Publicly accessible