Search OEDI Data
Showing results 51 - 58 of 58.
Show
results per page.
Order by:
Available Now:
Research Areas
Accessibility
Data Type
Organization
Source
New River Geothermal Exploration (Ram Power Inc.)
The New River Geothermal Exploration (DOE Award No. EE0002843) is located approximately 25km south of the Salton Sea, near town of Brawley in Imperial County and approximately 150km east of San Diego, California.
A total of 182 MT Logger sites were completed covering the two sepa...
Mirza, R. and Data, E. Ram Power, Inc.
Nov 15, 2013
20 Resources
0 Stars
Publicly accessible
20 Resources
0 Stars
Publicly accessible
Wave Energy Prize 1/20th Testing Harvest Wave Energy Oscillating Wave Surge Converter
Data from the 1/20th scale testing data completed on the Wave Energy Prize for the Harvest Wave Energy team, including the 1/20th scale test plan, raw test data, video, photos, and data analysis results.
The top level objective of the 1/20th scale device testing is to obtain the ...
Scharmen, W. Ricardo Detroit Technical Center
Aug 26, 2016
34 Resources
0 Stars
Publicly accessible
34 Resources
0 Stars
Publicly accessible
2024 Annual Technology Baseline (ATB) Cost and Performance Data for Electricity Generation Technologies
These data provide the 2024 update of the Electricity Annual Technology Baseline (ATB). Starting in 2015 NREL has presented the ATB, consisting of detailed cost and performance data, both current and projected, for electricity generation and storage technologies. The ATB products ...
Mirletz, B. et al National Renewable Energy Laboratory (NREL)
Jun 24, 2024
14 Resources
1 Stars
Publicly accessible
14 Resources
1 Stars
Publicly accessible
Geothermal Reservoir Simulation Results in support of Feasibility Study of Direct District Heating for the Cornell Campus Utilizing Deep Geothermal Energy
This dataset contains input data, code, ReadMe files, output data, and figures that summarize the results of a stochastic analysis of geothermal reservoir production from two potential geothermal reservoirs that were evaluated for the Cornell University Deep Direct-Use project. Th...
Smith, J. and Beckers, K. Cornell University
Oct 29, 2019
10 Resources
0 Stars
Publicly accessible
10 Resources
0 Stars
Publicly accessible
ARPA-E Grid Optimization (GO) Competition Challenge 1
The ARPA-E Grid Optimization (GO) Competition Challenge 1, from 2018 to 2019, focused on the basic Security Constrained AC Optimal Power Flow problem (SCOPF) for a single time period. The Challenge utilized sets of unique datasets generated by the ARPA-E GRID DATA program. Each da...
Elbert, S. et al Pacific Northwest National Laboratory
Aug 05, 2024
29 Resources
0 Stars
Publicly accessible
29 Resources
0 Stars
Publicly accessible
Silver Peak Innovative Exploration Project (Ram Power Inc.)
Data generated from the Silver Peak Innovative Exploration Project, in Esmeralda County, Nevada, encompasses a deep-circulation (amagmatic) meteoric-geothermal system circulating beneath basin-fill sediments locally blanketed with travertine in western Clayton Valley (lithium-rich...
Miller, C. Ram Power, Inc.
Jan 01, 2010
27 Resources
0 Stars
Publicly accessible
27 Resources
0 Stars
Publicly accessible
ARPA-E Grid Optimization (GO) Competition Challenge 3
Synthetic Input Data and Team Results for the GO Competition Challenge 3 for Events 1 4 and the Sandbox, along with problem and format descriptions and code to validate data and solutions, are available here. Data for industry scenarios will not be made public.
The Grid Optimizat...
Elbert, S. et al Pacific Northwest National Laboratory
May 02, 2024
39 Resources
1 Stars
Publicly accessible
39 Resources
1 Stars
Publicly accessible
UNH TDP Concurrent Measurements of Inflow, Power Performance, and Loads for a Grid-Synchronized Vertical Axis Cross-Flow Turbine Operating in a Tidal Estuary
This data was collected between October 12 and December 15 of 2021 at the University of New Hampshire (UNH) and Atlantic Marine Energy Center (AMEC) turbine deployment platform (TDP). This data set includes over 29 days of grid connected turbine operation during this 65 day time f...
Wosnik, M. et al National Renewable Energy Laboratory
Dec 21, 2021
30 Resources
0 Stars
Publicly accessible
30 Resources
0 Stars
Publicly accessible